ST9304-CS 900423 COPPELt. PUBLIC WO~S /
NEHOBAND~
TO: STEVE GORAMt DIRECTOR OF PUBLIC WORKS
FROM: PER BIRDSALL, STREET SUPERINTENDENT ~
DATE: APRIL 23, 1990
RE: STREET STRIPING OF EAST BELT LINE ROAD
TICKLER 4/20/90
I HAVE OBSERVED THAT THE CITY OF DALLAS HAS APPARENTLY STRIPED THE CENTERLINE OF
EAST BELT LINE ROAD.
END TICKLER
P HB / B B V~ Z
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: March 22, 1990
TO: Steve Goram, Director of Public Works
FROM: Per Birdsall, Street Superintendent~
RE: Street Striping of East Belt Line Road
Tickler 3/22/90
I was contacted on 3/20/90byDean Stellers from the City of Dallas
Engineering Department, who said that they would stripe the road
soon if the overlay which they have planned is not to occur in the
next three months. If the overlay does occur, it will be striped
thereafter. Status~/20/90
PHB/bb
EAST. PHB
COPPELL PUBLIC WORKS
MEMORANDUM
March 8, 1990
To: Steve Goram, Director of Public Works
From: Per Birdsall, Street Superintendent ~i~
Re: Street Striping - East Sandy Lake, East Beltline and Bethel Road
Tickler 3/16/90
The County was out last Monday and completed the striping as requested.
COPPELL PUBLIC WORKS
DATE: March 1, 1990
TO: Steve Goram, Director of Public Works
FROM: Per Birdsall, Street Superintendent~
RE: Street Striping - East Sandy Lake
East Belt Line and Bethel Road
The County was out Monday and painted the westbound (north side)
edge stripe from Coppell Road to the City Limits, but no other edge
striping was done on these roads, they should be back out next week
if the weather is good.
Next Status March 16, 1990
PHB / bb
STRIPING.PHB