Loading...
ST9304-CS 900423 COPPELt. PUBLIC WO~S / NEHOBAND~ TO: STEVE GORAMt DIRECTOR OF PUBLIC WORKS FROM: PER BIRDSALL, STREET SUPERINTENDENT ~ DATE: APRIL 23, 1990 RE: STREET STRIPING OF EAST BELT LINE ROAD TICKLER 4/20/90 I HAVE OBSERVED THAT THE CITY OF DALLAS HAS APPARENTLY STRIPED THE CENTERLINE OF EAST BELT LINE ROAD. END TICKLER P HB / B B V~ Z COPPELL PUBLIC WORKS MEMORANDUM DATE: March 22, 1990 TO: Steve Goram, Director of Public Works FROM: Per Birdsall, Street Superintendent~ RE: Street Striping of East Belt Line Road Tickler 3/22/90 I was contacted on 3/20/90byDean Stellers from the City of Dallas Engineering Department, who said that they would stripe the road soon if the overlay which they have planned is not to occur in the next three months. If the overlay does occur, it will be striped thereafter. Status~/20/90 PHB/bb EAST. PHB COPPELL PUBLIC WORKS MEMORANDUM March 8, 1990 To: Steve Goram, Director of Public Works From: Per Birdsall, Street Superintendent ~i~ Re: Street Striping - East Sandy Lake, East Beltline and Bethel Road Tickler 3/16/90 The County was out last Monday and completed the striping as requested. COPPELL PUBLIC WORKS DATE: March 1, 1990 TO: Steve Goram, Director of Public Works FROM: Per Birdsall, Street Superintendent~ RE: Street Striping - East Sandy Lake East Belt Line and Bethel Road The County was out Monday and painted the westbound (north side) edge stripe from Coppell Road to the City Limits, but no other edge striping was done on these roads, they should be back out next week if the weather is good. Next Status March 16, 1990 PHB / bb STRIPING.PHB