Loading...
Amberpoint BP 2-LR021109REPORT OF SOIL-LIME MIXTURE PULVERIZATION ll'erracan Consulting Engineers 8, Scientists 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: Client No.: Client: 11/09/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600W Dallas, TX 75244 Report No.: Project No.: Project: Page No.: 94021380.0075 94021380 Staples 201 Northpoint Coppell, TX 1 of 2 Contractor: Test Location: Wier Bros. Lines A to J and 5 to 8 Test Method: NTCOG' Specification Requirements: Minimum Passing I 3/4" Sieve: ]00% Minimum Passing #4 Sieve: 60% sample Condition: Field Moist 1-3/4" SIEVE #4 SIEVE TEST LOCATION NO. % PASSING % PASSING 1 Grid line A.2/8.5 100 66 2 Grid line B/8.3 100 67 3 Grid line B.8/8.8 100 68 4 Grid line C.7/8.5 100 65 5 Grid line D.6/8.2 100 68 6 Grid line E.5/8.7 100 66 7 Grid line F.4/8.5 100 64 8 Grid line G.2/8.5 100 64 9 Grid line H/8.7 100 65 10 Grid line H.8/8.3 100 66 11 Grid line A.2/7.5 100 67 12 Grid line B/7.3 100 65 13 Grid line B.8/7.8 100 64 14 Grid line C.7/7.5 100 63 15 Grid line D.6/7.3 100 62 16 Grid line E.5/7.8 100 66 17 Grid line F.4/7.5 100 66 18 Grid line G.2/7.5 100 64 19 Grid line 1-1/7.2 100 65 20 Grid line H.8/7.7 100 64 21 Grid line A.2/6.5 100 66 22 Grid line B/6.3 100 67 23 Grid line B.8/6.8 100 63 24 Grid line C.7/6.5 100 65 25 Grid line D.6/6.2 100 64 (continued on next page) 309 This report is exclusively for the use of the client indicated above and shall not be reproduced, in full without written approval of HBC/Terracon. 'REPORT OF SOIL-LIME MIXTURE PULVERIZATION 'lretracan Dallas. Texas 75247 Date of Service: Client No.: Client: '11/09/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600W Dallas, TX 75244 Report No.: 94021380.0075 Project No.: 94021380 Project: Staples 201 Northpoint Coppell, TX Page No.: 2of2 Contractor: Test Location: Wier Bros. Lines A to J and 5 to 8 Test Method: NTCOG Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist 1-3/4" SIEVE #4 SIEVE TEST LOCATION NO. % PASSING % PASSING 26 Grid line E.5/6.3 100 65 27 Grid line F.4/6.4 100 66 28 Grid line G.2/6.5 100 64 29 Grid line 1-I/6.7 100 64 30 Grid line H.8/6.5 100 66 31 Grid line A.2 100 68 32 Grid line B 100 64 33 Grid line B.8 100 63 34 Grid line C.7 100 67 35 Grid line D.6 100 64 36 Grid line E.5 100 66 37 Grid line F.4 100 63 38 Grid line G.2 100 64 39 Grid line H 100 64 40 Grid line H.8 100 65 Technician: B. Rengstorff Report Distribution: (1) Transwestern Commercial Services (1) Hill & Wilkinson, Ltd. (1) O'Brien & Associates (1) TechniStructures (1) City of Coppell - Bldg. Insp, 309 (1) City of Coppell - Constr. Insp. (1) State Farm Insurance (1) HBC Engineering - Project File (1) Carter & Burgess ll'erracon Eugene Harbour Principal Th/s report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Hl3C/Terracon. L