ST9401-CN 981110CITY COUNCIL MEETING: AGENDA REQUEST FORM November 10. 1998 ITEM ITEM CAPTION: Consider approval of Change Order #1 for Denton Tap Road Project #ST 94-01 in the amount of $120,351.00 to Rebcon Inc. for the revised bridge railing over Denton Creek; and authorizing the Mayor to sign. SUBMITTED BY: Ken Griffin, P.E. TITLE: Director of Engineering/Public Works STAFF RECOMMENDS: APPROVAL STAFF COMMENTS: ApPROVED BY CiTY COUNCIL DATE -/7/n;,/f g See attached memo. BUDGET AMT. $ AMT. EST. $ FINANCIAL COMMENTS: Funds £or th,s Change Order have been designated in the DIR. INITIALS: ~7 FIN. REVIEW:(~ Agcnda Request Form - Revised 3/98 II, I' I +/- BUD:$ Street CIP Funds. CITY MANAGER REVIEW.~/' Document Name: #eng3 To: From: RE: Date: MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING Mayor and City Council Ken Griffin, P.E., Director of Engineering and Public Works Consider approval of Change Order #1 for Denton Tap Road Project #ST 94-01 in the amount of $120,351 to Rebcon, Inc. for the revised bridge railing over Denton Creek; and authorizing the Mayor to sign. November 10, 1998 Since the start of construction on the bridge over Denton Creek on Denton Tap Road, questions have been asked concerning what type of bridge railing would be installed on the bridge. The project was initially bid with bridge railing very similar to the ones constructed on Heartz Road by the libraps' and on Parkway Blvd. by Copperstone Addition. Those bridge railings have brick or pilaster columns with painted tubular steel between the columns. Apparently, some time in the past, there have been conversations concerning installing identical bridge rails along Belt Line Road / Denton Tap Road. Currently, the types of bridge railings are cast in place concrete bridge railings. As you drive along Denton Tap Road, those can be observed at Cottonwood Branch, Grapevine Creek and near the new IBM building. To be consistent with the existing bridge railing along Belt Line Road / Denton Tap Road, staff recommends the deletion of the bridge railing as originally bid and the inclusion of the cast-in-place concrete bridge railing. Therefore, staff recommends the approval of Change Order #1 to Rebcon, inc~ in the amount of $120,351. Staff will be available to answer any questions at the council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" November 2, 1998 Mr. Garreth Campbell City of Coppell Engineering Dept. P,O. Box 478 Coppell, Texas 75019 \ 2 RE: Denton Tap Road Dear Garreth: The redesign of the bridge railing on this project involves the following changes in costs: Delete the following from the contract: 19. Furnish and install special bridge rails 1,487LF $140.00/LF $208,180.00 AIt Item 18 Furnish and install special bridge rail per Section 04 Sheet 57 76LF $140.00/LF $ 10,640.00 Total Deductions $218,820.00 Add the following to the contract: Concrete bridge rail, wrought iron fence, and railing on bike path below bridge 1563LF $217.00/LF $339,1 71.00 Total Additions $339,171.00 Total net change to the contract is: $120,351.00 Rebcon will require an additional 2___0 working days to be added to our contract to allow this work to be constructed. Please note the following items: 1 ) Because of the deck construction method using precast concrete panels the outside dowel bars on the pedestals and columns may need to have the horizontal leg shortened to allow them to fit properly. 2) Dowel bars on the east bridge inside rail will not be placed 11/4" above the slab bottom but will be some distance above the top of the precast panels. %,,,_. 1868 w. NORTHWEST H\./VY. DALLAS, TEXAS 7,5220 972/444-8230 3) Our price assumes that the detail of the typical balluster sheet S1A of 9 has 3- #6 on both sides of balluster top and that the vertical leg of the #5 dowel is 2.75', 4) We are disregarding the plan view and its dimensions on sheet S1 of 9 in lieu of dimensions and layout shown on SIB of 9. 5) We have budgeted expansion joint cost in our price but need to know locations for those joints. We feel that the wingwall/column joint should also go at armor joints. We need to know where you want the rail joints. 6) We do not have any additional deck steel in our price or additional strands in the beam to carry the additional loading. !f any of this will be required we ,,vii! need to chanae our price. 7) Painting of the concrete rail is included. Please let us know as soon as possible, if the City wants us to construct this rail. It is very important in keeping this job moving. If you have any questions, please let me know. Yours Very Truly, REBCON, INC. Robert C. BiBby P.O. Box 478 Coppell. Texas 75019 972-462-0022 November 19, 1998 Mr. Robert C. Bibby REBCON, Inc. 1868 W. Northwest Hwy. Dallas, TX 75220 RE: Denton Tap Road Project # ST 94-01 (from Cottonwood Creek to S.Ft. t21 gypass) Dear Mr. Bibby: Change Order #1 was approved at our November 10, 1998 City Council meeting. Attached a~'e four copies of Change Order #1 signed by the Mayor. Please execute the: 'foyer ,:c,,ioies~ ;::~.i';¢¥ , copy for your file and remm three copies to our office. If you have any questions feel flee to contact the Engineering Department ~/i: :C!?'7';~.):'~t 3~ ', %' '; :.. Sincerely, Kenneth M. .iZ. Director of Engineer and Public Works co: Garreth D. Campbell, Construction Inspector Ulys Lane, P.E., Wier & Associates, Inc. LETTER OF TRANSMITTAL FROM: REBCON, INC. 1868 WEST NORTHWEST HIGHWAY DALLAS, TEXAS 75220 OFFICE #: (972) 444-8230 FAX #: (972) 444-8234 TO:City of Coppell Engineering Department ADDRESS:P.O. Box 478 CITY: Coppell STATE: Texas ZIP: 75019 ATTENTION:Mr. Ken Griffin DATE: 11-23-98 JOB NO:9809 RE:Denton Tap Road Cottonwood Creek to S.H. 121 Bypass City of Coppell PLEASE BE ADVISED: WE ARE SENDING YOU: DATE COPIES 11-10-98 3 PLANS CONTRACT LETTER DESCRIPTION Change Order No. 1 SHOP DRAWINGS SUB-CONTRACT SPECIFICATIONS X CHANGE ORDER SAMPLES OTHER THESE ARE BEING TRANSMITTED AS INDICATED BELOW: FOR APPROVAL X AS REQUESTED FOR YOUR USE FOR YOUR COMMENTS APPROVED AS IS RETURNED AFTER LOANED TO US COMMENTS: FOR BID(S) DUE RETURNED WITH CORRECTIONS SIGNED: TYPED NAME: Robert C. Bibby CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: Denton Tap Road Project # ST 94-01 Rebcon Inc. City of Coppell 1 DATE: 11/10/98 DELETE: I~m Quantity 19 1,487 Description Furnish & install special bridge rails Furnish & install Special bridge rail per Section 04 Sheet 57 Total Deductions: ADD: Alt 76 18 ADD: Concrete bridge rail, 1563 wrought iron fence, & railing on bike path below bridge Total Additions: 20 Working Days Total Revision to Contract Amount Previous contract amount Net increase in contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion Unit Unit Price Total LF 140.00 208,180.00 LF 140.00 10,640.00 LF $218,820.00 217.00 $339,171.00 $339,171.00 $120,351.00 $3,572,687.90 $120,351.00 $3,693,038.90 20 Working Days 290 Working Days Rebcon will require an additional 20 working days to be added to our contract to allow this work to be constructed. Please note the following items: 1. Because of the deck construction method using precast concrete panels the outside dowel bars on the pedestals and columns may need to have the horizontal leg shortened to allow them to fit properly. 2. Dowel bars on the east bridge inside rail will not be placed 1 ~,~" above the slab bottom but will be some distance above the top of the precast panels. 3. Our price assumes that the detail of the typical balluster sheet S1A of 9 has 3 - #6 on both sides of balluster top and that the vertical leg of the #5 dowel is 2.75'. '. Dent6n Tal5 Road Project Sf 94-01 Change Order #1 Page 2 4. We are disregarding the plan view and its dimensions on sheet S1 of 9 in lieu of dimensions and layout shown on S1B of 9. 5. We have budgeted expansion joint cost in our price but need to know locations for those joints. We feel that the wingwall/column joint should also go at armor joints. We need to know where you want the rail joints. 6. We do not have any additional deck steel in our price or additional strands in the beam to carD' the additional loading. If any of this will be required we will need to change our price. 7. Painting of the concrete rail is included. The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under an:,' clause in the Contract by reason of this revision to the Contract. r Recommended by City Engineer Date r A~'~xi ,o b~ C~91~Ct~r /: Da~e ^pproved by ~wher