SS9901-CS021122TurnerCollieOBraden Inc TRANSMITTAL
ENGINEERS•PLANNERS•PROJECT MANAGERS
17300 Dallas Parkway
Suite 1010
Dallas, Texas 75248
972- 735 -3000
Fax 972 - 735 -3001
To: Mr. Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019 -4409
Date: November 22, 2002
Re: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
Job No.: 052131124.0001.02000.Al23
Transmitted By: Messenger
We are sending you the following:
Copies Description
3 Pre -Bid Submittal — Force Main Lines "A & B" (Specifications)
3 Pre -Bid Submittal — Force Main Lines "A & B" (Full Size Plans)
3 Pre -Bid Submittal — Force Main Lines "A & B" (Half Size Plans)
3 Force Main Lines "A & B" Construction Estimate
3 90% Complete Submittal — Force Main Line "D" (Specifications)
3 90% Complete Submittal — Force Main Line "D" (Full Size Plans)
3 90% Complete Submittal — Force Main Line "D" (Half Size Plans)
3 Force Main Line "D" Construction Estimate
3 80% Complete Submittal — Deforest Lift Station (Specifications)
3 80% Complete Submittal — Deforest Lift Station (Full Size Plans)
3 80% Complete Submittal — Deforest Lift Station (Half Size Plans)
3 Deforest Lift Station Construction Estimate
1 Record Drawings — Force Main Line "C" (Original Mylars)
2 Record Drawings — Force Main Line "C" (Full Size Plans)
1 Force Main Lines "A & B" Previous City Review Comments (Half Size Plans)
1 Force Main Line "D" Previous City Review Comments (Full Size Plans)
Remarks:
See Attached Letter.
Copies To: File
By: _ /
_7 f; � _
Ted Sugg, P.E.
Project Manager
�✓U ZZ N ov °OZ