Loading...
SS9901-CS021122TurnerCollieOBraden Inc TRANSMITTAL ENGINEERS•PLANNERS•PROJECT MANAGERS 17300 Dallas Parkway Suite 1010 Dallas, Texas 75248 972- 735 -3000 Fax 972 - 735 -3001 To: Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 -4409 Date: November 22, 2002 Re: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements Job No.: 052131124.0001.02000.Al23 Transmitted By: Messenger We are sending you the following: Copies Description 3 Pre -Bid Submittal — Force Main Lines "A & B" (Specifications) 3 Pre -Bid Submittal — Force Main Lines "A & B" (Full Size Plans) 3 Pre -Bid Submittal — Force Main Lines "A & B" (Half Size Plans) 3 Force Main Lines "A & B" Construction Estimate 3 90% Complete Submittal — Force Main Line "D" (Specifications) 3 90% Complete Submittal — Force Main Line "D" (Full Size Plans) 3 90% Complete Submittal — Force Main Line "D" (Half Size Plans) 3 Force Main Line "D" Construction Estimate 3 80% Complete Submittal — Deforest Lift Station (Specifications) 3 80% Complete Submittal — Deforest Lift Station (Full Size Plans) 3 80% Complete Submittal — Deforest Lift Station (Half Size Plans) 3 Deforest Lift Station Construction Estimate 1 Record Drawings — Force Main Line "C" (Original Mylars) 2 Record Drawings — Force Main Line "C" (Full Size Plans) 1 Force Main Lines "A & B" Previous City Review Comments (Half Size Plans) 1 Force Main Line "D" Previous City Review Comments (Full Size Plans) Remarks: See Attached Letter. Copies To: File By: _ / _7 f; � _ Ted Sugg, P.E. Project Manager �✓U ZZ N ov °OZ