Loading...
SS9901-EM021122DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINES A & B CONSTRUCTION COST ESTIMATE 11/22/02 Item No. Description Unit Quantity Unit Price Total 1 20" DI Force Main by open cut LF 3602 $60 $216,120 2 20" DI Force Main by bore / no encasement LF 208 $130 $27,040 3 20" DI Force Main by bore with 36" steel encasement LF 888 $250 $222,000 4 30" DI Force Main by open cut LF 708 $90 $63,720 5 30" DI Force Main by bore with 48" steel encasement LF 102 $300 $30,600 6 Ductile Iron Fittings TN 17.25 $4,000 $69,000 7 4" Combination A/V Valve with manhole EA 8 $5,000 $40,000 8 Bore under exist tree / no encasement EA 2 $750 $1,500 9 Hydromulch seeding SY 3813 $1 $3,813 10 Traffic Control LS 1 $2,500 $2,500 11 Storm Water Pollution Prevention LS 1 $2,500 $2,500 12 Connect to Exist Manhole EA 1 $5,000 $5,000 Sub -Total $683,793 10% Contingency $68,379 Total $752,172