Loading...
SS9901-EM021122DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE 11/22/02 Item No. Description Unit Quantity Unit Price Total 1 30" DI Force Main by open cut LF 6178 $90 $556,020 2 30" DI Force Main by bore / no encasement LF 857 $150 $128,550 3 30" DI Force Main by bore with 48" steel encasement LF 1658 $300 $497,400 4 Ductile Iron Fittings TN 18.825 $4,000 $75,300 5 4" Combination A/V Valve with manhole EA 10 $5,000 $50,000 6 Bore under exist tree / no encasement EA 15 $750 $11,250 7 Hydromulch seeding SY 5424 $1 $5,424 8 Traffic Control LS 1 $2,500 $2,500 9 Storm Water Pollution Prevention LS 1 $2,500 $2,500 Sub -Total $1,328,944 10% Contingency $132,894 Total $1,461,838