Loading...
ST9304-CS 900115 COPPELL PUBLIC WORKS MFI4ORANDUM DATE: January 15, 1990 TO: Steve Goram, Director of Public Works FROM: Per Birdsall, Street Superintendent~ RE: Street Striping - East Sandy Lake, East Belt Line, and Bethel Road Tickler 1/12/90 The County is prepared to start striping on 1/16/90 (if it doesn't rain). I have submitted the requisition to Barbara for processing. Status 1/26/90 NOTE: Barbara has referenced the requisition already and is ready for your signature/approval. PHB/bb STRIPING.PHB