Amberpoint BP 2-LR021118REPORT OF REINFORCING STEEL OBSERVATION
1Erracon
Consulting Engineers & Scientists
8901 Carpenter Fmty., Suite #100
Dallas, Texas 75247
Date of Service: 1 1/18/02 Report No.:
Client No.: 3181 Project No.:
Client: Transwestern Commercial Services Project:
5001 Spring Valley Rd Ste 600W
Dallas, TX 75244
94021380.0094
94021380
Staples
201 Northpoint
Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: S3. l, dated 11/12/02
Locations/Items Observed: Slab-on-Grade, lines G to H.8 and 1.5 to 10.7
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT iNCORRECT ITEMS OBSERVED CORRECT INCORRECT iTEMS OBSERVED CORRECT INCORRECT
Placing Drawings A~proved X Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Placement X stirrup Spacing & Type
Bar Grade X Propedy Tied X
Rodar Clean X Dowel Bars in Place X Welded Splices
Form Clean X Proper Supports X Mectmnical Splices
~u~,her o~ Ba~ X Pr°per Co,er X Lapped S~,ce~ X
Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise
noted.
Field Results Report To:
Technician: B. Rengstorff
Report Distribution:
(1) Transwestern Commercial Services
(1) Hill & Wilkinson~ Ltd.
(1) O'Brien & Associates
(1) TechniStructures
(1) City of Coppell - Bldg. Insp.
309sks
(1) City of Coppell - Constr. Insp.
(1) State Farm Insurance
(1) HBC Engineering
(1) Carter & Burgess
'lrerracon
Eugene Harbour
Principal
This report is exclusively for the use el the client indicated above and shall not be reproduced without wdlten approval of HBC/Terracon.