Loading...
Amberpoint BP 2-LR021111REPORT OF LIME DEPTH CHECKS Date of Service: Client No.: Client: 11/11/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600W Dallas, TX 75244 Report No.: Project No.: Project: lrerracan 8901 Carpenter Frwy,, Suite #100 Dallas, Texas 75247 94021380.0079 94021380 Staples 201 Northpoint Coppell, TX Contractor: Test Location: Test Method: Wier Bros. Specification Requirements: 8 inches Slab-on-Grade, lines A to J and 5 to 8 NTCOG TEST DEPTH OF LIME NO. LOCATION (in.) 1 Grid line B.5/5.5 8+ 2 Grid line D/5.5 8+ 3 Grid line E.5/5.5 8+ 4 Grid line G/5.5 8+ 5 Grid line H.5/5.5 8+ 6 Grid line G.5/6.5 8+ 7 Grid line F.0/6.5 8+ 8 Grid line D.5/6.5 8+ 9 Grid line C/6.5 8+ 10 Grid line A.5/6.7 8+ 11 Grid line B.5/7.5 8+ 12 Grid line D/7.5 8+ 13 Grid line E.5/7.5 8+ 14 Grid line G/7.5 8+ 15 Grid line H.5/7.5 8+ 16 Grid line G.5/8.5 8+ 17 Grid line F/8.5 8+ 18 Grid line D.5/8.5 8+ 19 Grid line C/8.5 8+ 20 Grid line A.5/8.5 8+ Technician: B. Rengstorff Report Distribution: (1) Transwestern Commercial Services (1) Hill & Wilkinson, Ltd. (1) O'Brien & Associates (1) TechniStructures (1) City of Coppell - Bldg. lnsp. 309 (1) City of Coppell - Constr. Insp. (1) State Farm Insurance (1) Carter & Burgess (1) HBC Engineeing ll'erracan Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC/Terracon. 'REPORT OF SOIL-LIME MIXTURE PULVERIZATION lrerracan 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: Client No.: Client: 11/11/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600W Dallas, TX 75244 Report No.: Project No.: Project: 94021380.0078 94021380 Staples 201 Northpoint Coppell, TX Contractor: Test Location: Wier Bros. Lines A to J and 9 to 11 Test Method: NTCOG Specification Requirements: Minimum Passing I 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist TEST LOCATION 1-3/4" SIEVE #4 SIEVE NO. % PASSING % PASSING 1 Grid line A.2/9.2 100 67 2 Grid line B/9.5 100 64 3 Grid line B.8/9.8 100 66 4 Grid line C.7/9.2 100 65 5 Grid line D.6/9.5 100 67 6 Grid line E.5/9.8 100 68 7 Grid line F.4/9.5 100 64 8 Grid line G.2/9.2 100 66 9 Grid line H/9.5 100 65 10 Grid line H.8/9.8 100 64 11 Grid line A.2/10.2 100 66 12 Grid line B/10.5 100 68 13 Grid line B.8/10.8 100 67 14 Grid line C.7/10.5 100 64 15 Grid line D.6/10.2 100 66 16 Grid line E.5/10.5 100 67 17 Grid line F.4/10.8 100 68 18 Grid line G.2/10.5 100 66 19 Grid line I-I110.2 100 64 20 Grid line H.8/10.8 100 65 Technician: B. Rengstorff Report Distribution: (1) Transwestern Commercial Services (1) Hill & Wilkinson, Ltd. (1) O'Brien & Associates (1) Technistructures (1) City of Coppell - Bldg. lnsp. 309 (1) City of Coppell - Constr. Insp. {1) State Farm Insurance (1) HBC Engineering - Project File (1) Car~er & Burgess 'l tracan Eugene Harbour Principal Tl~is report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC/Terracon,