Loading...
PA9702-LR 9909102ONCRETE COMPRES VE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallss, Texas 75:~A7 ~)ate of Service: 08/11/1999 Report No.: 9921738 Report Date 09/10/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Tcxas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 sack CONCRETE SUPPLIER: Nelson Bros. Concrete PLACEMENT DATE: 03/11/1999 BATCH TIME: 6:59am PLANT: 1 TIME SAMPLED: 7:34am BY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STP~NGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 84 F CONCRETE: 86 F SLLrlVIP: 3-5" TRUCK NO: 211 TICKer NO: 76354 AIR: N/,~ AIRCONTENT(%): N/A UNITWEIGHT(per): TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Floor slab, A-D and 1-7 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Line C/4 REPORT OF TESTS ACCUMULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUI~P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 I 6.00 08/18/1999 7 128670 4550 1 2 6.00 08/I 8/1999 7 125120 4420 Average 4490 1 3 6.00 09/08/1999 28 178490 6310 1 4 6.00 09/08/1999 28 174460 6170 Average 6240 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. bNCRETE COMPRES E STRENGTH TEST/'' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: 08/11/1999 Report No.: 9921738 Report Date 09/10/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pcll Project: Coppell Aquatic/Recreation Ctr Ann: Bra~Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~)6051 Services: Obtain samp~es ~f fresh c~ncrete at the p~acement ~~cati~ns~ perf~rm required ~e~d test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 sack CONCRETE SUPPLIER: Nelson Bros. Concrete PLACEMENT DATE: 08/11/1999 BATCH TIME: 7:15am PLANT: 1 TIME SAMPLED: 8:15am BY: Roy Montgomery ~PECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 85 F CONCRETE: 87 F SLUMP: 3-5" TRUCK NO: 222 TICKET NO: 76358 AIR: N/A AIRCONTENT(%): N/A UNITWEIGHT(per]: N/A rEST METHOD: ASTM C- 143 pLACEMENT LOCATION: Floor slab, lines A-D and 1-7 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B/I.5 REPORT OF TESTS ACCt~AT~VE VA~S: i00 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 5.50 08/18/1999 7 127570 4510 2 2 5.50 08/18/1999 7 121080 4280 Average 4400 2 3 5.50 09/08/1999 28 170180 6020 2 4 5.50 09/08/1999 28 168960 5980 Average 6000 Technician: Roy Montgomery Started: 6:00am Finished: 9:00am ~ Engineering, Inc. Report Distribution: (1) City of Coppell (1) City of Coppell - Engineering (I) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. lnsp. Eugene Harbour (l) Turner Engineers (1) City of Coppcil - Leisure Serv Dcpt Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 'r I ~ I