Loading...
SW0001-CS021125UJ 000 � BMW HFDBB926YD202 arrd Smil Business Enterprise GREEN S iiLl Grass Establishment • Erosion Control • Wetland Development • Mitigation • Biotechnical Embankment November 25, 2002 Ken Griffin City of Coppell Department of Engineering 255 Parkway Boulevard Coppell, TX 75019 Re: Green Scaping References Dear Mr. Griffin: �y We are looking forward to the opportunity to work for the City of Coppell on the upcoming project. The Project Superintendent for this job is Rick Edwards, 817- 996 -2578. We intend on using Excel Foundation, Mr2 ark Bice, as as ¢ 1 subcontractor for the elevated sidewalk. All other work we will perform in- house. 4S-6 ¢(,44 eoVR�y�,�iltT2.��I T7 Green Scaping, a O /M/WBE company, was established in May of 1984. At that time, Green Scaping specialized in maintenance, irrigation and landscaping. In June of 1992, the company added focus to include large erosion control projects. Our scope of work includes athletic fields, parks, stadiums, mine reclamation, drainage control, commercial sites, landscaping, landfills, and wetland mitigation projects. Recently we have expanded our operation to include brick and concrete construction our list of services. We currently maintain a minimum of 22 employees and own in excess of $1.5M of erosion control and construction equipment. We are capable of following techniques of turf establishment block or rolled sod, spot or plug sodding, hydra - sprigging, hydro- seeding, hydro - mulching, sprigging, straw and hay mulching, broadcast and drill seeding, pipe irrigation and truck watering, as well as installation of brick pavers, modular wells, and concrete construction. As you can see, we have a thorough and knowledgeable background in turf establishment, landscaping, concrete construction and irrigation. Attached is a list of a few of the jobs we have worked on, and a list of contractor references. We look forward to working with you and your organization. Please call if we can be of further assistance, or if you have any questions regarding our business. Sincerely, L L Pf a, J� rr 4, s v.&.Lz �T�t (0 2 (.2 o Yv,40.IL 4 - Cathleen Ruiz i 3 G S C) - 3 Partner 8917 Cardinal lane • North Richland Hills • Texas • 7618D Tel: 817.577.9299 • Fax: 817.577.9331 • Web: www.green- scaping.com 66 Rn6ronroc- YYY •�YY, r„rrr. Owner /GC Job Name Scope of Work Amount Start Date % complete City of Euless Glade Road Median Installed brick pavers and $29,265 10/02 100% City of Southlake Pavers concrete paving. Ed Wilson 817.925.1283 James Wilson City of Southlake Hwy 1709 Trail Installed brick pavers, concrete $360,000 4/02 80% City of Plano Concrete Restoration p aving, and modular wall. $288,000 12/02 0% Ed Wilson Marine Creek Parkway Installed main lane concrete $69,297 10/01 100% Richland Hills p aving. City of Keller Old Town Keller Main Responsible for landscaping and $560,000 7/01 100% City of Hurst Street hardscaping the Keller Main $210,000 1/03 0% Replacement Street, including the installation of trees, brick pavers, concrete paving, irrigation. In addition. street lights, park benches and trash rece tacles. City of Ft Worth Brick Pave Repair Install brick pavers and curb $176,404 9/01 100% and gutter replacement. City of Keller Keller Sports Park Install concession stand, $576,000 8/02 90% Phase V concrete, and playground Rayzor Ranch Lantana Development Provided Irrigation, landscaping, $2,400,000 2/01 100% concrete hardscape, sod, and trees for 180,00 AC development In6v Ilminr rnnlror -t- YYYY YYY Yr„�, Owner /GC rrw Job Name Scope of Work Amount Start Date %Complete City of Fort Worth Evans Avenue Install landscaping, irrigation, $825,000 1/03 0% City of Southlake Reconstruction concrete brick pavers, and site Ed Wilson 817.925.1283 James Wilson City of Euless 817.999.4246 furnishings City of Grapevine 817.454.1995 Danny Porter City of Plano Concrete Restoration Remove and replace concrete $288,000 12/02 0% City of North Neighborhood Parks Install Pavilion, site furnishings, $1,115,000 12/02 0% Richland Hills concrete play grounds irri ation, and landscapin City of Hurst Annual Concrete Remove and Replace concrete $210,000 1/03 0% Replacement throughout the ci Contractor References: Dwner/GC Phone Contact City of Keller 817.431.1955 Ed Ilschner City of Ft. Worth 817.871.7802 Najib Fares City of Southlake 817.481.2197 Dave Flemnig Ed Wilson 817.925.1283 James Wilson City of Euless 817.999.4246 Chris Barker City of Grapevine 817.454.1995 Danny Porter 8917 Cardinal Lane • North Richland Hills • Texas • 76180 Tel: 817.577.9299 • Fax: 817.577.9331 • Web: www.green- scaping.com Green Scaping Equipment Log Equipment Type Model Year Tractors M -120 2000 Tractors 9580 1996 Tractors 5450 1994 Tractors 3650 1992 Tractors R30 Ditch Witch 1984 Tractors Bob Cat 8731 1999 Tractors Bob Cat 8732 2000 Backhoe Caterpillar 420D 2001 Skid Steer Caterpillar 262 2002 Trucks International 4 Door 1 1999 Trucks International 4 Door 2 2000 Trucks (Old One) International 4 Door gas 1985 Trucks International water truck 2001 Trucks International 1 2000 _ Trucks International Mulcher 2001 Trucks International Tractor 1985 Trucks Volvo Flatbed 1986 Trucks Ford Mulcher 1982 Trucks Chevy 1500 1992 11/25/2002 RICHARD WILLIAM EDWARDS 6124 Maurie Court Haltom City, TX 76148 Mobile: 817 - 996 -2578 OBJECTIVE: To obtain a challenging position with a public agency, engineering firm or construction company. QUALIFICATIONS: ** Major managerial and construction responsibilities. ** Human resources background. ** Well versed with numerous educational seminars. ** Areas of expertise include: estimating, administration, & field engineering construction. EMPLOYMENT HISTORY: 2001 - Present C. Green Scaping L.P. -North Richland Hills, Texas Manager Responsible for the day -to -day concrete, modular wall and brick paving operation. Responsibilities include estimating, purchasing of material, project management, processing change orders, monthly pay estimates and project close out. Projects completed as general contractor vary up to $2,000,000. 1997 -2001 Tri Dal Ltd. - Southlake, Texas Manager Responsible for the day -to -day operations of the modular retaining wall, concrete brick paver and erosion control division. Responsibilities also have included the estimating and project management of municipal and commercial utility projects. This has entailed the procurement of bonds, reviewing contracts, processing change orders, purchasing materials, monthly pay estimates, reviewing project budget reports and project close out. Daily use of Excel, Lotus Notes & Word Perfect. 1994 -1997 City of Grapevine - Grapevine, Texas Construction Coordinator/Inspector Responsible for the inspection and interpretation of plans and specifications in all areas of highway, street maintenance, water, sewer, parks construction, landscaping and drainage construction. These responsibilities have included several projects adapting to existing city utilities. Major projects have included the $6,000,000 widening of a major city artery, while continuing to inspect other projects in progress. Other responsibilities include the calculation of monthly progress payments, daily diaries and interaction with local residents. 1990 -1994 Harris & Associates - Concord, California Assistant Resident Engineer and Senior Construction Inspector Responsibilities have included inspection and interpretation of plans and specifications, scheduling of personnel for job site assignments, the drafting and implementation of change orders, while operating within budget. Project involvement has included the $23,000,000 widening project of a major state highway. This job involved the construction of five traffic lanes, two bridges, drainage paving, utility relocation landscaping and miscellaneous items. Other project involvement was the construction of an $18,000,000 interchange with four bridge structures, drainage, paving, traffic control, electrical traffic signals and the removal of hazardous waste. 1985 -1990 Gerico Traffic Systems Inc. - Dallas, Texas Vice - President of Operations Responsible for the statewide construction of highway projects involving contract administration, supervision of 15 -20 personnel, estimating project cost, scheduling of projects, equipment maintenance, purchasing of materials and field construction. 1973 -1985 M.E. Hunter & Associates - Atlanta, Georgia Vice - President of Operations Duties included the responsibility for equipment maintenance, field personnel of 50 -75 employees and the scheduling of projects for the Southwest United States. Other responsibilities included estimating projects, forecasting future work and the hiring of field personnel. Responsible for the development and enforcement of company safety and EEO policies. 1970 -1973 Tampa Electric Company - Tampa, Florida Apprentice Maintenance Mechanic Duties included daily repair and maintenance of condensers, pumps, and intake screens, boiler tubes, crusher hammers and conveyors in a coal fired generating plant. EDUCATION St. Petersburg Junior College Clearwater, Florida University of South Florida Tampa, Florida Major: Business Major: Business California Coast University Major: Management Received Bachelor of Science degree PROFESSIONAL MEMBERSHIPS & CERTIFICATIONS American Public Works Association Certified Public Works Professional Texas A &M University Construction Inspection Certification California State University Wastewater Certification REFERENCES Available upon request.