SW0001-CS021125UJ 000 �
BMW HFDBB926YD202 arrd Smil Business Enterprise
GREEN S iiLl
Grass Establishment • Erosion Control • Wetland Development • Mitigation • Biotechnical Embankment
November 25, 2002
Ken Griffin
City of Coppell Department of Engineering
255 Parkway Boulevard
Coppell, TX 75019
Re: Green Scaping References
Dear Mr. Griffin: �y
We are looking forward to the opportunity to work for the City of Coppell on the upcoming project. The Project
Superintendent for this job is Rick Edwards, 817- 996 -2578. We intend on using Excel Foundation, Mr2 ark Bice, as as ¢ 1
subcontractor for the elevated sidewalk. All other work we will perform in- house. 4S-6
¢(,44 eoVR�y�,�iltT2.��I
T7
Green Scaping, a O /M/WBE company, was established in May of 1984. At that time, Green Scaping specialized in
maintenance, irrigation and landscaping. In June of 1992, the company added focus to include large erosion control
projects. Our scope of work includes athletic fields, parks, stadiums, mine reclamation, drainage control, commercial sites,
landscaping, landfills, and wetland mitigation projects. Recently we have expanded our operation to include brick and
concrete construction our list of services.
We currently maintain a minimum of 22 employees and own in excess of $1.5M of erosion control and construction
equipment. We are capable of following techniques of turf establishment block or rolled sod, spot or plug sodding, hydra -
sprigging, hydro- seeding, hydro - mulching, sprigging, straw and hay mulching, broadcast and drill seeding, pipe irrigation
and truck watering, as well as installation of brick pavers, modular wells, and concrete construction.
As you can see, we have a thorough and knowledgeable background in turf establishment, landscaping, concrete
construction and irrigation. Attached is a list of a few of the jobs we have worked on, and a list of contractor references.
We look forward to working with you and your organization. Please call if we can be of further assistance, or if you have
any questions regarding our business.
Sincerely, L L Pf a, J� rr 4, s v.&.Lz �T�t
(0 2 (.2 o Yv,40.IL 4 -
Cathleen Ruiz i 3 G S C) - 3
Partner
8917 Cardinal lane • North Richland Hills • Texas • 7618D
Tel: 817.577.9299 • Fax: 817.577.9331 • Web: www.green- scaping.com
66 Rn6ronroc-
YYY •�YY, r„rrr.
Owner /GC
Job Name
Scope of Work
Amount
Start Date
% complete
City of Euless
Glade Road Median
Installed brick pavers and
$29,265
10/02
100%
City of Southlake
Pavers
concrete paving.
Ed Wilson
817.925.1283
James Wilson
City of Southlake
Hwy 1709 Trail
Installed brick pavers, concrete
$360,000
4/02
80%
City of Plano
Concrete Restoration
p aving, and modular wall.
$288,000
12/02
0%
Ed Wilson
Marine Creek Parkway
Installed main lane concrete
$69,297
10/01
100%
Richland Hills
p aving.
City of Keller
Old Town Keller Main
Responsible for landscaping and
$560,000
7/01
100%
City of Hurst
Street
hardscaping the Keller Main
$210,000
1/03
0%
Replacement
Street, including the installation
of trees, brick pavers, concrete
paving, irrigation. In addition.
street lights, park benches and
trash rece tacles.
City of Ft Worth
Brick Pave Repair
Install brick pavers and curb
$176,404
9/01
100%
and gutter replacement.
City of Keller
Keller Sports Park
Install concession stand,
$576,000
8/02
90%
Phase V
concrete, and playground
Rayzor Ranch
Lantana Development
Provided Irrigation, landscaping,
$2,400,000
2/01
100%
concrete hardscape, sod, and
trees for 180,00 AC development
In6v Ilminr rnnlror -t-
YYYY YYY Yr„�,
Owner /GC
rrw
Job Name
Scope of Work
Amount
Start Date
%Complete
City of Fort Worth
Evans Avenue
Install landscaping, irrigation,
$825,000
1/03
0%
City of Southlake
Reconstruction
concrete brick pavers, and site
Ed Wilson
817.925.1283
James Wilson
City of Euless
817.999.4246
furnishings
City of Grapevine
817.454.1995
Danny Porter
City of Plano
Concrete Restoration
Remove and replace concrete
$288,000
12/02
0%
City of North
Neighborhood Parks
Install Pavilion, site furnishings,
$1,115,000
12/02
0%
Richland Hills
concrete play grounds
irri ation, and landscapin
City of Hurst
Annual Concrete
Remove and Replace concrete
$210,000
1/03
0%
Replacement
throughout the ci
Contractor References:
Dwner/GC
Phone
Contact
City of Keller
817.431.1955
Ed Ilschner
City of Ft. Worth
817.871.7802
Najib Fares
City of Southlake
817.481.2197
Dave Flemnig
Ed Wilson
817.925.1283
James Wilson
City of Euless
817.999.4246
Chris Barker
City of Grapevine
817.454.1995
Danny Porter
8917 Cardinal Lane • North Richland Hills • Texas • 76180
Tel: 817.577.9299 • Fax: 817.577.9331 • Web: www.green- scaping.com
Green Scaping Equipment Log
Equipment Type
Model
Year
Tractors
M -120
2000
Tractors
9580
1996
Tractors
5450
1994
Tractors
3650
1992
Tractors
R30 Ditch Witch
1984
Tractors
Bob Cat 8731
1999
Tractors
Bob Cat 8732
2000
Backhoe
Caterpillar 420D
2001
Skid Steer
Caterpillar 262
2002
Trucks
International 4 Door 1
1999
Trucks
International 4 Door 2
2000
Trucks (Old One)
International 4 Door gas
1985
Trucks
International water truck
2001
Trucks
International
1 2000 _
Trucks
International Mulcher
2001
Trucks
International Tractor
1985
Trucks
Volvo Flatbed
1986
Trucks
Ford Mulcher
1982
Trucks
Chevy 1500
1992
11/25/2002
RICHARD WILLIAM EDWARDS
6124 Maurie Court
Haltom City, TX 76148
Mobile: 817 - 996 -2578
OBJECTIVE: To obtain a challenging position with a public agency,
engineering firm or construction company.
QUALIFICATIONS:
** Major managerial and construction responsibilities.
** Human resources background.
** Well versed with numerous educational seminars.
** Areas of expertise include: estimating, administration, & field
engineering construction.
EMPLOYMENT HISTORY:
2001 - Present C. Green Scaping L.P. -North Richland Hills, Texas
Manager
Responsible for the day -to -day concrete, modular wall and brick paving
operation. Responsibilities include estimating, purchasing of material,
project management, processing change orders, monthly pay estimates and
project close out. Projects completed as general contractor vary up to
$2,000,000.
1997 -2001 Tri Dal Ltd. - Southlake, Texas
Manager
Responsible for the day -to -day operations of the modular retaining wall,
concrete brick paver and erosion control division. Responsibilities also have
included the estimating and project management of municipal and
commercial utility projects. This has entailed the procurement of bonds,
reviewing contracts, processing change orders, purchasing materials,
monthly pay estimates, reviewing project budget reports and project close
out. Daily use of Excel, Lotus Notes & Word Perfect.
1994 -1997 City of Grapevine - Grapevine, Texas
Construction Coordinator/Inspector
Responsible for the inspection and interpretation of plans and specifications
in all areas of highway, street maintenance, water, sewer, parks construction,
landscaping and drainage construction. These responsibilities have included
several projects adapting to existing city utilities. Major projects have
included the $6,000,000 widening of a major city artery, while continuing to
inspect other projects in progress. Other responsibilities include the
calculation of monthly progress payments, daily diaries and interaction with
local residents.
1990 -1994 Harris & Associates - Concord, California
Assistant Resident Engineer and Senior Construction Inspector
Responsibilities have included inspection and interpretation of plans and
specifications, scheduling of personnel for job site assignments, the drafting
and implementation of change orders, while operating within budget.
Project involvement has included the $23,000,000 widening project of a
major state highway. This job involved the construction of five traffic lanes,
two bridges, drainage paving, utility relocation landscaping and
miscellaneous items. Other project involvement was the construction of an
$18,000,000 interchange with four bridge structures, drainage, paving,
traffic control, electrical traffic signals and the removal of hazardous waste.
1985 -1990 Gerico Traffic Systems Inc. - Dallas, Texas
Vice - President of Operations
Responsible for the statewide construction of highway projects involving
contract administration, supervision of 15 -20 personnel, estimating project
cost, scheduling of projects, equipment maintenance, purchasing of materials
and field construction.
1973 -1985 M.E. Hunter & Associates - Atlanta, Georgia
Vice - President of Operations
Duties included the responsibility for equipment maintenance, field
personnel of 50 -75 employees and the scheduling of projects for the
Southwest United States. Other responsibilities included estimating
projects, forecasting future work and the hiring of field personnel.
Responsible for the development and enforcement of company safety and
EEO policies.
1970 -1973 Tampa Electric Company - Tampa, Florida
Apprentice Maintenance Mechanic
Duties included daily repair and maintenance of condensers, pumps, and
intake screens, boiler tubes, crusher hammers and conveyors in a coal fired
generating plant.
EDUCATION
St. Petersburg Junior College
Clearwater, Florida
University of South Florida
Tampa, Florida
Major: Business
Major: Business
California Coast University Major: Management
Received Bachelor of Science degree
PROFESSIONAL MEMBERSHIPS & CERTIFICATIONS
American Public Works Association
Certified Public Works Professional
Texas A &M University Construction
Inspection Certification
California State University
Wastewater Certification
REFERENCES Available upon request.