Loading...
ST9602-CS021112Parsons Brinckerhoff Construction - - -10o r Services, Inc November 12, 2002 Mr. Scott Young, P.E. USA 8700 Stemmons Freeway, Suite 400 Dallas, TX 75247 CMAO Program Office 1701 N. Market Street, Suite 410 Dallas, TX 75202 Phone: 214- 747 -6336 Fax: 214 -741 -1937 Subject: Congestion Mitigation Air Quality (CMAQ) Program Railroad Exhibit Comments - Project 10 Dear Mr. Young: TxDOT is planning to award this construction contract about June 2003. The timetable will primarily be controlled by the amount of time it takes TxDOT to get a contract with the railroad. TxDOT has identified some changes to Exhibit A that are necessary for this railroad contract to proceed. See the attachments as described below. We request you make the necessary corrections and return a signed and sealed mylar of the changes by November 22, 2002. If you feel that some review comments need further discussion, notify this office immediately upon receipt. If you have any questions, please contact this office at 214 - 747 -6336 ext. 28 or Craig Goodroad at ext. 25. Sincerely, ack W. Loggins, P.E. Program Manager (1.) Ten comments noted as "Review of MacArthur at DART (2.) Two 8.5 x 11 mark -up sheets (3.) E -mail from Scott Booker (4.) New Format Example "General Notes" — 11 x 17 (5.) Signal Preemption Work Sheet (6.) Information From FRA Website (7.) Mark Ups of Sheets 33 and 34 from Plans. Attachments: = loor cc: Sam Wilson, P.E., Dallas County Transportation Engineer, w/o attachments Suja Mathew, P.E., TxDOT Roadway Design Office, w/ attachments Fraydoon Nafissi, P.E., TxDOT Roadway Design Office, w/o attachments Dexter Hollabaugh, P.E., TxDOT Railroad Office, w/o attachments tV, P.E., City of Coppell, w/o attachments Over a Century of Engineering Excellence H:\PI4C0RR\P14- 1OUnP10- Usa\046 RR Final Comments.doc