ST9905-CS021114 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Date:
RE:
Jim Witt, City Manager
Clay Phillips, Deputy City Manager
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works
November 14, 2002
Bethel Road Project ST 99-05
Since 1998, the City of Coppell has been evaluating drainage associated with West Bethel Road. In
1998 the City of Coppell hosted a meeting between the then property owners of the two large tracts
of land on the north side of Bethel Road to discuss the development of their property in regard to
drainage in Bethel Road. Those tracts of land are now referred to as the "Champion" and "Duke-
Weeks" tracts. The drainage basin for this portion of Bethel Road also includes approximately 240
acres of airport property discharging into Bethel Road at Royal Lane. In addition to that, the bulk
postal facility and the Minyards tract also discharge into Bethel Road. In total, there was
approximately 676 acres of land that discharged into Bethel Road near Coppell Road.
Realizing that drainage was going to be the overriding design consideration for the construction of
Bethel Road, a drainage study was commissioned by the City of Coppell called the "Southwest
Coppell Storm Water Management Master Plan". It was a joint venture between the City of
Coppell, NCH and Coppell Industrial NV. The study was prepared by Halff and Associates. The
study pointed to the fact that detention would be required on the land north of Bethel Road and on
the airport property. The detention on the airport property was crucial because of the short distance
from Royal Lane to Freeport Parkway and the fact that there was no available land in that section
for detention.
In 2001, the City of Coppell entered into a design contract with TranSystems Corporation for the
design of Bethel Road from the west city limits to Freeport Parkway. The design contract was
structured so that there would be additional drainage studies to complement the previous drainage
study. TranSystems' drainage study also pointed to the fact that detention would be required. By
this time, the property north of Bethel Road had already been developed by "Champion" and
"Duke-Weeks" and in both cases the City of Coppell required detention that would not allow the
discharge of any additional water from the site than what would normally discharge in an
undeveloped condition. Also, the water from the "Champion" and "Duke-Weeks" property was
conveyed in an easterly direction and discharged into Grapevine Creek north of Loch Lane, not
directly into Bethel Road.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
Page 1 of 4
The challenge now is to design a drainage system that will convey a 100-year storm and at the
same time not create any downstream erosion problems in Grapevine Creek. TranSystems has
provided two drainage studies for the City of Coppcll to accommodate the drainage along Bethel
Road. Both studies show that detention will be required on the airport property. The detention on
thc airport property is needed to detain the increase in water runoff when thc 242-acres of airport
property develops. The last design by TranSystems shows two detention ponds strategically located
on the airport property generally along the west side of Royal Lane.
The design of a drainage system to accommodate the developed runoff along Bethel Road is not an
overwhelming engineering feat. Simply put, to convey the drainage along Bethel Road, it is only a
matter of installing additional box culverts. Preliminary design estimates are that there would need
to be seven 10'x5' box culverts along Bethel Road to accommodate the 100-year ultimate
developed runoff. However~ the real challenge in this design is to balance the conveyance of
water with the potential for downstream erosion in Grapevine Creek. As you may be aware,
we have had erosion along a portion of Big Cedar and Country Estates and there is evidence of
erosion in Hunterwood Park. To effectively collect all the ultimate developed stormwater in a
drainage system in Bethel Road i.e., the construction of seven 10'x5' box culverts, and convey that
water to Coppell Road and discharge it into Grapevine Creek just north of the Senior Citizens
Center would not be the wisest approach to accommodate the drainage associated with Bethel
Road. That approach would very effectively and rapidly convey a large amount of water to an
earthen channel and in effect create the potential for additional downstream erosion problems.
The goal in this drainage design is to detain the increased runoff difference between the
undeveloped airport land as it exists today and the future developed airport land Detention
on the airport property is a critical component of this design. To that end, I met with
representatives of DFW Airport in July 2002 and presented them a copy of the revised draft
drainage report prepared by TranSystems. That report detailed the necessity for detention on the
airport property. I left a copy of the report for their review and asked them to respond to me
concerning the likelihood of a detention basin on airport property. I was even willing to accept a
letter from the airport stating that if at some point in the future they chose to develop then they
would construct detention at that time.
I have a legal opinion from Pete Smith that states that the City of Coppell cannot require the airport
to abide by our subdivision rules and regulations in regard to the development of their property.
Therefore, unless the airport decides to create detention, the City of Coppell cannot require
detention, even on the section of land that lies within the City of Coppell. However, representatives
of DFW Airport stated that they are bound by EPA and other environmental rules and regulations
the same as any municipality. They also have to obtain all permits and approvals prior to
development of their property.
It was my hope based on the meeting, that I would receive correspondence from DFW Airport
stating that they understood the drainage situation and they would be willing to construct detention
on their property at a future date if they decided to develop the 240-acres that drain into the City of
Coppell. After numerous telephone calls, I was told in October 2002 that there would be no letter
forthcoming obligating DFW Airport for any future action.
Page 2 of 4
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
The situation we find ourselves in today is:
· 1) The airport will not allow us to construct detention on their property;
· 2) The airport will not commit to construct detention in the furore; and
· 3) It is my professional opinion that it would not be wise to construct an efficient system to
discharge all the future water into Grapevine Creek knowing that there are downstream erosion
problems that exist today.
I contacted our consultant, TranSystems, and asked them to evaluate the drainage system that was
proposed with Bethel Road to detemfine what level of capacity we would have in the future if no
detention was constructed on the airport property. In essence, what I was asking is: if we build a
system today in anticipation of detention on the airport property in the future and the airport chose
not to construct detention, but instead chose to discharge all of their water into our "undersized"
drainage system what level of capacity would we have in our drainage system? The reply to that
question is that we would have a drainage system capable of conveying about a 25-year fully
developed storm. If the system only conveys approximately a 25-year storm, then any larger event
that we have i.e., 50 or 100-year storm, creates the potential for street flooding along Bethel Road.
The City of Coppell Subdivision Ordinance requires that drainage systems be designed for a 100-
year fully developed storm event. Without a detention basin, the drainage system cannot be
designed for a 100-year storm without discharging a substantial amount of water into an
unimproved section of Grapevine Creek. At this point, I find myself at a standstill on moving
ahead with this project. One the one side ifI build an efficient system to convey all the water in the
future, I stand a very strong risk of creating erosion problems in Grapevine Creek. On the other
side, ifI authorize the consultant to only design a system that will convey a 25-year storm I mn the
risk of having street flooding along Bethel Road in those rare storm events that exceed a 25-year
frequency.
It is my recommendation that we design a drainage system capable of conveying a 25-year
ultimate developed storm and work with the airport at some future date when they chose to
develop the property in Coppell to try, to obtain some type of detention onsite. It's important
to note that our system will convey the 100-year storm as long as the airport property remains
undeveloped. Also, if the airport constructs detention in the furore, our system will still convey the
100-year storm. The only situation that reduces the capacity of our system would be if the airport
fully developed their property and released all the water without detention. With an undersized
system downstream, if and when the airport decides to develop, they will be in a predicament of
how to convey their water because our system would not be adequate to allow the release of all of
their water. So there is a possibility that they would be forced to have some type ofonsite detention
just by virtue of the downstream system being undersized. To construct a system not in
conformance with the Subdivision Rule and Regulations requires a variance from City Council.
Therefore, I will take an agenda item on December 10, 2002 to request a variance.
If you have any questions, please feel free to contact me.
Page 3 of 4
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
Summary of Key Dates:
· February4,1999
"Southwest Coppell Storm Water Management Master Plan" by Halff &
Associates.
Sponsored by: The City of Coppell, NCH, & Coppell Industrial NV
· March 22,1999
Legal opinion from Pete Smith that we cannot require DFW Airport to
install detention.
· April 13, 1999
Memo to Curtis Inglis, DFW Airport, providing summary of meeting
between Halff & Assoc., and Tracy Thompson, Doug Bryan & Mike Pyles
of DFW Airport and requesting clarification of drainage requirements on
airport property.
· May ll, 1999
Summary of reply from Curtis Inglis of DFW. Mr. Inglis spoke with
Kevin Cox and Gary Keane and Mr. Inglis stated that development of
airport property would be accomplished in responsible manner.
· February 13, 2001 Entered into design contract with TranSystems Corporation for Bethel
Road and associated drainage.
· January 18, 2002 Received "Drainage Report Executive Summary" from TranSystems.
Report outlined necessity for detention on DFW Airport property.
· May30,2002
· July 18, 2002
· October 11, 2002
· October 14, 2002
· October25, 2002
Received "Revised Draft Drainage Report for Regional Detention
Analysis / Bethel Road Improvements".
Met with representatives of DFW Airport and provided copy of"Revised
Draft Drainage Report for Regional Detention Analysis / Bethel Road
Improvements" for their review.
Was informed that representatives of DFW Airport would not commit to
any detention now or in the future.
Requested evaluation of drainage system in Bethel Road if n__qo detention
was provided by DFW Airport when they developed and our system was
constructed today as if there was no increase in runoff from DFW.
Received letter from TranSystems that system would convey
approximately a 25-year storm with ultimate development without
detention.
Page 4 of 4