A copy of the Notice to Proceed and the letter to the residents concemin,q the Phase
I road closure. Construction of the improvements is scheduled to beRin on Monday,
December 16.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLE/tSE CALL (972) 304-3679
City of Coppell Engineertng- Excellence By Destgn
T H I[ · C I 1' Y · O F
COFPELL
P.O. Box 478
255 Parkway Bird
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972)304-7041
ENGINEERING DEPARTMENT
FAX CO VER SHEET
To: Police Administration From: Suzan Taylor
Fmc 972-304-3535 Date: December 09, 2002
Phone: Page~ 3 (including cover sheet)
Re-, Ruby Road ST 01-02 cc:
X FYI DFor Review [] Please Comment [] Please Reply [] As Requested
.Comm.lt~:
Construction of Ruby Road started in eady December 2002. The road
will be closed in two phases durin,q the construction. Attached is a letter
descdbin,q the Phase I road closure. If you have any questions, please
contact Garreth Campbell (972-304-3685) or me (972-304-7019).
IF YOU DO NOT RECEIVE ALL OF THE PAGES PI. EASE CALL (972) 304-3679
"CIO, of Coppell Engineering- Excellence By Design"
T H E · C I T Y · 0 F
COPPELL
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972)304-7041
ENGINEERING DEP 4RTMENT
FAX COVER SHEET
To: Kevin Ponder From: Suzan Taylor
Company: Waste Management Date:.December 09, 2002
Fax= 972-315-5411 PaSe.: 3 (including cover sheet)
Re-, Ruby Road ST 01-02 cc:
X FYI I-IFor Review [] Please Comment [] Please Reply [] As Requested
,Comments:
Construction of Ruby Road started in early December 2002. The mad
will be closed in two phases durin.q the construction. Attached is a letter
describin,q the Phase I mad closure. If you have any questions, please
contact Garreth Campbell (972-304-3685) or me (972-304-7019).
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLE~SE CALL (972) 304-3679
"City of Coppell Engineering- Excellence By Design"
T H E: * C I T Y · O F
COPPELL
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972) 304-7041
ENGINEERING DEPARTMENT
FAX CO VER SHEET
To.' Fire Department From: Suzan Taylor
Fax: 972-304-3514 Date: December 09, 2002
Phone: Pages.' 3 (including cover sheet)
Da: Ruby Road ST 01-02 cc:
X FYI I-IFor Review [] Please Comment [] Please Reply [] As Requested
Construction of Ruby Road started in eady December 2002. The road
will be closed in two phases durin,q the construction. Attached is a letter
descdbinR the Phase I road closure. If you have any questions, please
contact Garreth Campbell (972-304-3685) or me (972-304-7019).
YOU DO NOT RECEIVE ALL OF THE PAGES PLF-4SE CALL (972) 304-3679
"CiO~ of Coppell Engineering- Excellence By Design"
T H B · G I T Y · 0 F
COPPELL
~ ~ & ~.
December 9, 2002
RE: Ruby Road
ST 01-02
Road Closure
The City of Coppell is recon~t~acting Ruby Road in order to provide a safer route to Wagon
Wheel Park and the developing industrial are~ The improvements consist of the
reeonsixaction of the existing 2-lane asphalt road to a 2-lane undivided concrete roadway with
improved storm drainage, and the installation of water and sewer utilities. Construction of the
improvements started in early December 2002 and will take approximately 150 days to
complete.
In evaluating the actual logistics of the reconstruction of Ruby Road, it became apparent that it
would be almost impossible to maintain two-way traffic on Ruby Road during reconstruction.
There are four driveways that intersect Ruby Road along the north side. Two of these belong
to a sIngle-family residence and two belong to the Oak Park Village mobile home park. A
two-phase road closure plan was developed to allow portions of Ruby Road to be closed while
still maintaining access to and from the adjacent propen'y. See the attached exhibit for the
phases.
Phase I of the road closure will start on December 16, 2002. The existing roadway from
State/Freeport Parkway to the west side of the easternmost driveway of the mobile home
park will be closed. This will allow residents in the mobile home park and the owner of
the single-family residence to exit their property to the east towards Coppeil Road. It is
anticipated that this portion of the roadway will be closed until the beginning of March
2003.
If you have any questions, please contact Ganeth Campbell, Project Inspector, at 972-304-
3685 or Suzan Taylor in Engineering at 972-304-7019.
p~o~l Iladdo3
'X~{d Llodee.{d / aqo~,S
poo;d II~,ddoo
._
[]
L
COPPELL
December 09, 2002
Mr. Mark Askew
Affordable Residential Communities
1204 Hillcrest
Gainesville, Texas 76240
Ruby Road Project
ST 01-02
Phase I Road Closure
Dear Mr. Askew:
The City of Coppell is reconstructing Ruby Road in order to provide a safer mute to Wagon Wheel
Park and the developing indus~al area. The improvements consist of the reconsmaction of the existing
2-lane asphalt road to a 2-lane undivided concrete roadway with improved storm drainage, and the
installation of water and sewer utilities. Construction of the improvements started in early December
2002 and will take approximately 150 days to complete.
In evaluating the actual logistics of the reconstruction of Ruby Road, it became apparent that it would
be almost impossible to maintain two-way traffic on Ruby Road during reconstruction. There are four
driveways that intersect Ruby Road along the north side. Two of these belong to a single-family
residence and two belong to the Oak Park Village mobile home park. A two-phase road closure plan
was developed to allow portions of Ruby Road to be closed while still maintaining access to and bom
the adjacent property. See the attached exhibit for the phases.
Phase I of the road closure will start on December 16, 2002. The existing roadway from
State/Freeport Parkway to the west side of the easternmost driveway of the mobile home park
will be closed. This will allow residents in the mobile home park and the owner of the single-
family residence to exit their property to the east towards Coppell Road. It is anticipated that
this portion of the roadway will be dosed until the beginning of March 2003.
If you have any questions, please contact Gasreth Campbell, Project Inspector, at 972-304-3685 or me
at 972-304-7019.
Sincerely,
aylor
ordinator
Attachment
-,~m~d podmgJ.I ~ ~leIS
poo~l Ileddoo
._o
,(o~a^lja~___~
T H ~ · C: I T Y · 0 F
COPPELL
December 09, 2002
Mr. Calvin Moore
600 Ruby Road
Coppell, Texas 75019
Ruby Road Project
ST 01-02
Phase I Road Closure
Dear Mr. Moore:
The City of Coppell is reconstructing Ruby Road in order to provide a safer mute to Wagon Wheel
Park and the developing industrial area. The improvements consist of the reconstruction of the existing
2-lane asphalt road to a 2-lane undivided concrete roadway with improved storm drainage, and the
installation of water and sewer utilities. Construction of the improvements started in early December
2002 and will take approximately 150 days to complete.
In evaluating the actual logistics of the reconstruction of Ruby Road, it became apparent that it would
be almost impossible to maintain two-way lraffic on Ruby Road during reconstruction. There are four
driveways that intersect Ruby Road along the north side. Two of these belong to a single-family
residence and two belong to the Oak Park Village mobile home park. A two-phase road closure plan
was developed to allow portions of Ruby Road to be closed while still maintaining access to and from
the adjacent property. See the attached exhibit for the phases.
Phase I of the road closure will start on December 16, 2002. The existing roadway from
State/Freeport Parkway to the west side of the easternmost driveway of the mobile home park
will be closed. This will allow residents in the mobile home park and the owner of the single-
family residence to exit their property to the east towards Coppell Road. It is anticipated that
this portion of the roadway will be closed until the beginning of March 2003.
If you have any questions, please contact Garreth Campbell, Project Inspector, at 972-304-3685 or me
at 972-304-7019.
Sincerely,
aylor
dinator
Attachment
p~o~ ileddoO
poo{:{ ileddoO
- ' - ~"~*,~i^,,q-o
',(M~d 1.JodeeJ-I / elo1S