Loading...
ST0102-CS021211T H E * G I T Y · O Ir COPPELL P.O. Box 478 255 Pan~'way Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To.' Mr. Paul Zaccarelli From: Suzan Taylor Fax: 972-304-8482 ~ate: December 11, 2002 Phone: Pages: 3 (including cover sheet) Re: Ruby Road ST 01-02 cc: X FYI I-IFor Review [] Please Gomment [] Please Reply [] As Requested .Comments: Construction of Ruby Road started in early December 2002. The mad will be closed in two phases durin.q the construction. Attached is a letter describing the Phase I mad closure. If you have any questions, please contact Garreth Campbell (972-304-3685) or me (972-304-7019). IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 City of Coppell Engineering- Excellence By Design T H [ · C I T Y · 0 F COFPELL December 12, 2002 Mr. Paul Zaccarelli, Post Master Coppell Post Office 450 S. Denton Tap Road Coppell, Texas 75019 Ruby Road Project ST 01-02 Phase I Road Closure Dear Mr. Zaccarelli: Construction of the Ruby Road improvements started in early December 2002 and will take approximately 150 days to complete. The contractor for the project, Tiseo Paving Company, developed a two-phase road closure plan to allow portions of Ruby Road to be closed while still maintaining access to and from the adjacent property. See the attached exhibit for the phases. Phase I of the road closure wifl start on December 16, 2002. The existing roadway from State/Freeport Parkway to the west side of the easternmost driveway of the mobile home park will be closed. This will allow residents in the mobile home park and the owner of the single-family residence to exit their property to the east towards Coppeil Road. It is anticipated that this portion of the roadway will be closed until the beginning of March 2003. The mail service to this area may need to be modified during construction. Once you have had an oppommity to review the exhibit and determine how it will impact mail service to this area, please contact Garreth Campbell, Project Inspector, at 972-304-3685 to discuss the phasing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, Suz2(n ~C. Taylor C.I.P.'-Uoordinator '1' H ~' · ~ I T Y · 0 F COPPELL P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Mr. Tom Ladusau Front:Suzan Taylor Fax: 214-496-80~.~. Dan December 11, 2002 Phone: PalI~: 3 (including cover sheet) Re:. Ruby Road ST 01-02 cc.. X FYi DFor Review [] Please Comment [] Please Reply [] As Requested Construction of Ruby Road started in early December 2002. The road will be closed in two phases durin.q the construction. Attached is a letter describin.q the Phase I road closure. If you have any questions1 please contact Garreth Campbell (972-304-3685) or me (972-304-7019). IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "C#y of Coppell Engmeermg- Excellence By Design 1' H E · C I T Y · O F COl'FELL P.O. Box 478 255 Pafl~way Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Dr. Jeff Tumer From: Suzan Taylor Fax: 214-496-6036 Date.' December 11,2002 Phone: Pages: 3 (including cover sheet) Re-. Ruby Road ST 01-02 cc-. X FYI I-IFor Review [] Please Comment [] Please Reply [] As Requested Construction of Ruby Road started in early December 2002. The road will be closed in two phases dudn.q the construction. Attached is a letter descdbin,q the Phase I road closure. If you have any questions1 please contact Garreth Campbell (972-304-3685) or me (972-304-7019). IF YOU DO NOT RECEIVE ALL OF TIlE PAGES PI, F~tSE CALl, (972) 304-3679 'CiO~ of Coppell Engineering- Excellence By Design" T H ir . (: I T Y · 0 F COFFELL December 12, 2002 Dr. Jeff Turner, Superintendent Coppell 1SD 200 S. Denton Tap Road Coppell, Texas 75019 Ruby Road Project ST 01-02 Phase I Road Closure Dear Dr. Turner: Construction of the Ruby Road improvements started in early December 2002 and will take approximately 150 days to complete. The contractor for the project, Tiseo Paving Company, developed a two-phase road closure plan to allow portions of Ruby Road to be closed while still maintaining access to and bom the adjacent property. See the attached exhibit for the phases. Phase I of the road closure will start on December 16, 2002. The existing roadway from State/Freeport Parkway to the west side of the easternmost driveway of the mobile home park will be closed. This will allow residents in the mobile home park and the owner of the single-family residence to exit their property to the east towards Coppell Road. It is anticipated that this portion of the roadway will be dosed until the beginning of March 200:3. The bus service to this area may need to be modified during construction. Once you have had an oppommity to review the exhibit and determine how it will impact bus service to this area, please contact Crarreth Campbell, Project Inspector, at 972-304-3685 to discuss the phasing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, · Taylor rdinator Cc: Tom Ladusau, Director of Support Services prm~l Ileddo3 .(OMa^ljO · :0 ',(/~td T-JodeeJ.-I / ~Iol, S '.(a4d ~odeeJj / 01oTs