Loading...
Northlake 635(5)-CS021218MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File %n~~,2, From: Larry Davis, Construction Inspector ~~ Date: December 18, 2002 RE: Coppell Commerce Center (Northlake 635 Business Park, Lot 1 Block D) Parking Lot Expansion As of this date, the non-residential paving has been completed to our specifications. This being a private project and having no work in the City's right-of--way or easement(s), no maintenance bonds or record drawings (as-bunts) are required. "CTfY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"