ST9905-CS021219 THE.CITY.OF o COPPELL ,M'~ ~ 2j "*..$1::- ~ ~ q " 5 \ % December 19,2002 TranSystems Corporation Paul Padilla, P.E. 3010 LBJ Freeway, Suite 990 Dallas, TX 75234 RE: Bethel Road Project ST 99-05 Dear Mr. Padilla: This letter is being written as a follow-up to our telephone conversation on December 11, 2002. On December 10, 2002 City Council approved a variance to our Subdivision Rules and Regulations that will allow the drainage system within Bethel Road that drains runoff from DFW Airport property to be designed at a frequency less than the 100-year ultimate design. Based on information that you have previously provided, it is my understanding that the system, as currently designed, will convey approximately a 25-year ultimate developed frequency storm. However, if DFW Airport were to provide detention on their property at some future date when they develop, our system would then convey the 100-year ultimate design storm. With this letter I am providing a copy of the approved City Council agenda item and my backup material. This letter will serve as your authorization to design the system that drains the runoff from DFW Airport property to accommodate a 25-year ultimate developed frequency storm, as opposed to the 100-year ultimate design required by our Subdivision Rules and Regulations. We will have a meeting the first part of January to address other issues associated with this project. My goal is still to complete the design and put the project out to bid in mid-2003. If you should have any questions or need additional information please feel free to contact me, if not I will be contacting you shortly to schedule the January meeting to discuss other issues. S';;:>f.f{-- Kenneth M. Griffin, P .E. Director of EngineeringlPublic Works Office 972/304-3686 Fax 972/304-7041 cc: Jerry Hodge, Dir. ofPW, City of Grapevine 255 PARKWAY * p,O SOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 TN..CITy.... ST'l9-b5 DEPT: EagiDeerioglPublle Works AGENDA REQUEST FORM COPPELL ..~.. ~ . ... " 4. . ,." DATE: December 10, 2001 ITEM #: 101E ITEM CAPTION: Consider approval of a variance to the Coppell Code of Ordinances Chapter 13, Appendix C Design Criteria and Standards, Section II Storm Sewers and Drainage, paragraph B Engineering Design for the construction of Bethel Road. GOAL(S): ~ IIII APPROVED BY CITY COUNCIL Motion to Approve ~ON...ABOVE DATE 7 t&,~ - M - Tunnell . lOs-peters. Vote - 7-0 EXECUTIVE SUMMARY: Approval of this item will allow the design of West Bethel Road, from the west city limits to Freeport Parkway, to proceed so that we can get back on schedule to bid the project for construction in late 2003. Staff recommends approval of the variance to Chapter 13 of the Code of Ordinances and will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: DIlL REVIEW, ;1ft FIN. REVIEW: " rt ~ CM REVIEW: - -" p/== '? ~ -.... - ...... .- - - Apada RequaI Fexm . Reviled cwm Docv-n' Nmae: 1IetIc2-IAR MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING RE: Mayor and City Council Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works December 10, 2002 Consider approval of a variance to Subdivision Ordinance No. 94-643 of the Code of Ordinances of the City of CoppeIl Appendix C Design Criteria and Standards, Section II Storm Sewers and Drainage, paragraph B Engineering Design. To: From: Date: The referenced section of the Subdivision Ordinance states "The Engineering design shall generally conform to the criteria set forth in the City of Coppell City-Wide Storm Water Management Study and the City of Dallas Drainage Design Manual." The Drainage Design Manual for the City of Dallas states "All drainage systems will be designed to accommodate the flow from the 100-year frequency storm. . .". Designing for the 100-year fully developed storm is a criteria that has been utilized in the City of Coppell since approximately 1990. There are some drainage systems within the City of Coppell which are not designed on the 100-year storm. Most notably, the drainage system along MacArthur Blvd. from Deforest Road south to Sandy Lake Road is designed on a 5-year frequency storm. Attached to this agenda item is a memo from myself to Jim Witt and Clay Phillips that goes into great detail about our attempts to design the drainage system in West Bethel Road on a 100-year design frequency. However, in designing systems for a 100-year frequency it is important to note where you are discharging the collected water. In the case of West Bethel Road, if you were to build a system to efficiently convey the 100-year design storm it would discharge water into the small creek on the east side of Loch Lane then convey the water through the unimproved portion of Grapevine Creek north of the Coppell Senior Citizens Center. This creek in turn meanders adjacent to Old Coppell Estates, Big Cedar, Country Estates, Grand Cove, Creekview Addition, etc. As Council may be aware, there have been several complaints of erosion in Grapevine Creek adjacent to those subdivisions. To collect all of the water and discharge it into Grapevine Creek on a IOO-year design is not the appropriate design for this drainage system. At best. that would be an irresponsible design that could create additional drainage problems downstream. There have been two drainage studies performed on this drainage basin, the first in 1999 and the second in 2002. Both studies point to the need for detention on the DFW Airport property. The airport property comprises 242-acres of the 464-acres of drainage basin that drains to the tributary on the east side of Loch Lane. This is approximately 52% of the entire drainage basin. As can be seen by the detailed memo, there have been numerous meetings and conversations with representatives of DFW Airport; however, in the final analysis, I have been told that DFW "CITY OF COPPELL ENGINEERING - E.XCELLE:'iCE BY DESIGN" Airport at this time will not support detention on their property nor acknowledge the concept or need for detention. At this time, I have three options concerning the drainage associated with West Bethel Road: l. Indefinitely Postpone the project; 2. Build an efficient system that collects the 100-year runoff and discharge it into the unimproved section of Grapevine Creek. This means seven 10'x5' box culverts within Bethel Road discharging into the small tributary on the north side of Bethel Road east of Loch Lane; or 3. Design a system that will handle the 100-year storm water runoff before the airport property develops. It is my opinion that Option 3 is the correct decision in the design of the drainage system. Option 3 gives us a lOO-year ultimate storm drain system until such time as DFW Airport develops the 242-acres of their property that drains through the City of Coppell. If they develop irresponsibly and discharge all their water into our system, then our drainage system will still have the future capacity to convey a 25-year storm. If they do the correct thing when they develop and design detention to detain the increase in runoff on their property, then our system will continue to have a 100-year capacity in the future. There are no guarantees on what the future holds on the development of the airport property or whether or not the airport will do a responsible development on the property in terms of drainage. To keep the Bethel Road project moving ahead, my recommendation is that the variance to the Subdivision Ordinance be approved to allow the construction of a drainage system that conveys the lOO-year runoff as it exists prior to development of the 242-acres of the airport property. Staff will be available to answer questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Jim Witt, City Manager Clay Phillips, Deputy City Manager Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works November 14, 2002 Bethel Road Project ST 99-05 From: Date: RE: Since 1998, the City of Coppell has been evaluating drainage associated with West Bethel Road. In 1998 the City of Coppell hosted a meeting between the then property owners of the two large tracts of land on the north side of Bethel Road to discuss the development of their property in regard to drainage in Bethel Road. Those tracts of land are now referred to as the "Champion" and "Duke- Weeks" tracts. The drainage basin for this portion of Bethel Road also includes approximately 240 acres of airport property discharging into Bethel Road at Royal Lane. In addition to that, the bulk postal facility and the Minyards tract also discharge into Bethel Road. In total, there was approximately 676 acres of land that discharged into Bethel Road near Coppell Road. Realizing that drainage was going to be the overriding design consideration for the construction of Bethel Road, a drainage study was commissioned by the City of Coppell called the "Southwest Coppell Storm Water Management Master Plan". It was a joint venture between the City of Coppell, NCH and Coppell Industrial NY. The study was prepared by Halff and Associates. The study pointed to the fact that detention would be required on the land north of Bethel Road and on the airport property. The detention on the airport property was crucial because of the short distance from Royal Lane to Freeport Parkway and the fact that there was no available land in that section for detention. In 2001, the City of Coppell entered into a design contract with TranSystems Corporation for the design of Bethel Road from the west city limits to Freeport Parkway. The design contract was structured so that there would be additional drainage studies to complement the previous drainage study. TranSystems' drainage study also pointed to the fact that detention would be required. By this time, the property north of Bethel Road had already been developed by "Champion" and "Duke- Weeks" and in both cases the City of Coppell required detention that would not allow the discharge of any additional water from the site than what would normally discharge in an undeveloped condition. Also, the water from the "Champion" and "Duke-Weeks" property was conveyed in an easterly direction and discharged into Grapevine Creek north of Loch Lane, not directly into Bethel Road. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Page I 0/4 The chaUene:e now is to desil!l1 a drainae:e system that will convev a tOO-vear stonn and at the same time not create any downstream erosion problems in Grapevine Creek. TranSystems has provided two drainage studies for the City of Coppell to accommodate the drainage along Bethel Road. Both studies show that detention will be required on the airport property. The detention on the airport property is needed to detain the increase in water runoff when the 242-acres of airport property develops. The last design by TranSystems shows two detention ponds strategically located on the airport property generally along the west side of Royal Lane. The design of a drainage system to accommodate the developed runoff along Bethel Road is not an overwhelming engineering feat. Simply put, to convey the drainage along Bethel Road, it is only a matter of installing additional box culverts. Preliminary design estimates are that there would need to be seven lO'x5' box culverts along Bethel Road to accommodate the 100-year ultimate developed runoff. However. the real challene:e in this desil!l1 is to balance the conveyance of water with the potential for downstream erosion in Grapevine Creek. As you may be aware, we have had erosion along a portion of Big Cedar and Country Estates and there is evidence of erosion in Hunterwood Park. To effectively collect all the ultimate developed stormwater in a drainage system in Bethel Road Le., the construction of seven 10'x5' box culverts, and convey that water to Coppell Road and discharge it into Grapevine Creek just north of the Senior Citizens Center would not be the wisest approach to accommodate the drainage associated with Bethel Road. That approach would very effectively and rapidly convey a large amount of water to an earthen channel and in effect create the potential for additional downstream erosion problems. The e:oal in this drainae:e desie:n is to detain the increased runoff difference between the undeveloped airport land as it exists today and the future developed airport land Detention on the airport property is a critical component of this design. To that end, I met ""1th representatives of DFW Airport in July 2002 and presented them a copy of the revised draft drainage report prepared by TranSystems. That report detailed the necessity for detention on the airport property. I left a copy of the report for their review and asked them to respond to me concerning the likelihood of a detention basin on airport property. I was even willing to accept a letter from the airport stating that if at some point in the future they chose to develop then they would construct detention at that time. I have a legal opinion from Pete Smith that states that the City of Coppell cannot require the airport to abide by our subdivision rules and regulations in regard to the development of their property. Therefore, unless the airport decides to create detention, the City of Coppell cannot require detention, even on the section of land that lies within the City of Coppell. However, representatives of DFW Airport stated that they are bound by EP A and other environmental rules and regulations the same as any municipality. They also have to obtain all permits and approvals prior to development of their property. It was my hope based on the meeting, that I would receive correspondence from DFW Airport stating that they understood the drainage situation and they would be willing to construct detention on their property at a future date if they decided to develop the 240-acres that drain into the City of Coppel!. After numerous telephone calls, I was told in October 2002 that there would be no letter forthcoming obligating DFW Airport for any future action. "CITY OF COPPELL ENGINEERING. EXCELLENCE BV DESIGN" Page 2 of ./ The situation we find ourselves in today is: . 1) The airport will not allow us to construct detention on their property; . 2) The airport will not commit to construct detention in the future; and . 3) It is my professional opinion that it would not be wise to construct an efficient system to discharge all the future water into Grapevine Creek knowing that there are downstream erosion problems that exist today. I contacted our consultant, TranSystems, and asked them to evaluate the drainage system that was proposed with Bethel Road to determine what level of capacity we would have in the future if no detention was constructed on the airport property. In essence, what I was asking is: if we build a system today in anticipation of detention on the airport property in the future and the airport chose not to construct detention, but instead chose to discharge all of their water into our "undersized" drainage system what level of capacity would we have in our drainage system? The reply to that question is that we would have a drainage system capable of conveying about a 25-year fully developed storm. If the system only conveys approximately a 25-year stonn, then any larger event that we have i.e., 50 or 100-year storm, creates the potential for street flooding along Bethel Road. The City of Coppell Subdivision Ordinance requires that drainage systems be designed for a 100- year fully developed stonn event. Without a detention basin, the drainage system cannot be designed for a [OO-year storm without discharging a substantial amount of water into an lmimproved section of Grapevine Creek. At this point, I find myself at a standstill on moving ahead with this project. One the one side if I build an efficient system to convey all the water in the future, I stand a very strong risk of creating erosion problems in Grapevine Creek. On the other side, if I authorize the consultant to only design a system that will convey a 25-year stonn I run the risk of having street flooding along Bethel Road in those rare storm events that exceed a 25-year frequency. It is mv recommendation that we desil!n a drainal!e system capable of convevinl! a 25-vear ultimate developed storm and work with the airport at some future date when they chose to develop the property in Coppell to try to obtain some type of detention on site. It's important to note that our system will convey the 100-year storm as long as the airport property remains undeveloped. Also, if the airport constructs detention in the future, our system will still convey the IOO-year stonn. The only situation that reduces the capacity of our system would be if the airport fully developed their property and released all the water without detention. With an undersized system downstream, if and when the airport decides to develop, they will be in a predicament of how to convey their water because our system would not be adequate to allow the release of all of their water. So there is a possibility that they would be forced to have some type of onsite detention just by virtue of the downstream system being undersized. To construct a system not in confonnance with the Subdivision Rule and Regulations requires a variance from City Council. Therefore, I will take an agenda item on December 10, 2002 to request a variance. If you have any questions, please feel free to contact me. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Page 3 of4 Summary of Key Dates: . February 4,1999 "Southwest Coppell Storm Water Management Master Plan" by Halff & Associates. Sponsored by: The City ofCoppell, NCH, & Coppell Industrial NY . March 22, 1999 Legal opinion from Pete Smith that we cannot require DFW Airport to install detention. . April 13, 1999 Memo to Curtis Inglis, DFW Airport, providing summary of meeting between Halff & Assoc., and Tracy Thompson, Doug Bryan & Mike Pyles of DFW Airport and requesting clarification of drainage requirements on airport property. . May 11, 1999 Summary of reply from Curtis Inglis of DFW. Mr. Inglis spoke with Kevin Cox and Gary Keane and Mr. Inglis stated that development of airport property would be accomplished in responsible manner. . February 13,2001 Entered into design contract with TranSystems Corporation for Bethel Road and associated drainage. . January 18, 2002 Received "Drainage Report Executive Summary" from TranSystems. Report outlined necessity for detention on DFW Airport property. . May 30, 2002 Received "Revised Draft Drainage Report for Regional Detention Analysis / Bethel Road Improvements". . July l8, 2002 Met with representatives ofDFW Airport and provided copy of "Revised Draft Drainage Report for Regional Detention Analysis / Bethel Road Improvements" for their review. . October 11,2002 Was informed that representatives ofDFW Airport would not commit to any detention now or in the future. . October 14, 2002 Requested evaluation of drainage system in Bethel Road if no detention was provided by DFW Airport when they developed and our system was constructed today as if there was no increase in runoff from DFW. . October 25,2002 Received letter from TranSystems that system would convey approximately a 25-year storm with ultimate development without detention. "CITY OF COPPELL ENGINEERING. EXCELLENCE BY DESIG:"i" Page -I of -I