Loading...
Hollows-CS01061500' T N E• C 1 T Y• O R COPPELL From: Rhonda Brothers, Engineering Secretary Date: June 15, 2001 RE: Expiring Maintenance Bond(s) To: Garreth Campbell, Construction Inspector Larry Davis, Construction Inspector The indicated Maintenance Bond(s) will expire as follows: MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING Project: Date: Inspector: Hollows Northlake Woodlands 8/15/01 Garreth Campbell Paving, Utilities, Erosion Please re- inspect the above mentioned project(s) to see that the public improvements for this project are in satisfactory condition. "CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"