Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA FY 0102-LR021218
Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN -PLACE DENSITY TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03 -007, Coppell, TX DATE: 18 December 2002 JOB NO.: 02.1077 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0°% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Royal Lane - Southbound Paving Replacement 4) @ 650 Royal 1 Fin. Sub. 11.6 130.0 108.4 95+ 5) between 601 & 621 Royal 1 Fin. Sub. 11.3 126.1 105.1 6) @ Citi Financial Bldg. 1 Fin. Sub. 11.1 129.7 108.1 TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148