Loading...
DR0001-EM021231I-V, I V%A„ �A * 2.S 0 000 - L MacARTHUR / SAMUEL DRAINAGE Project # DR 00 UNIT PRICE BID SCHEDULE 12 •',1 •Z Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -1 90 LF Remove 30" RCP Complete in Place 1 20 — 110 Dollars 1$OV and Cents per LINEAR FOOT. I -2 75 LF 36" Class IV RCP Complete in Place 1 5 Dollars and Cents per LINEAR FOOT. I -3 277 LF 27" Class III RCP Complete in Place bQ Dollars and Cents Per LINEAR FOOT. I-4 187 LF 24" Class IV RCP Complete in Place Dollars 6 S. t 7 I S S and Cents per LINEAR FOOT. I -5 209 LF 24" Class III RCP Complete in Place Dollars and Cents per LINEAR FOOT. I -6 167 LF 21" Class IV RCP Complete in Place S o — Dollars and Cents per LINEAR FOOT. 1 -18 Bidding Documents MacARTHUR / SAMUEL DRAINAGE Project # DR 00 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -7 68 LF 21" Class III RCP Complete in Place ' z, 2p Dollars 40 and Cents per LINEAR FOOT. I -8 1 EA 10' Openback Recessed Curb Inlet (Includes saw cut & paving for gutter transition) p o o v' Complete in Place Dollars and Cents per EACH. I -9 2 EA 10' Recessed Curb Inlet (Includes saw cut & paving for gutter transition) 8 0au ^ 160 00 Complete in Place Dollars and Cents per EACH. I -10 2 EA 6' Curb Inlet (Includes saw cut & paving for gutter transition) So�V ►ova Complete in Place Dollars and Cents per EACH. I -11 1 EA Type `A' Stormdrain Manhole (Includes breaking into existing 24" RCP) I n00t� "' ) oijO Complete in Place Dollars and Cents per EACH. 1 -19 Bidding Documents MacARTHUR I SAMUEL DRAINAGE Project # DR 00 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words Unit Total Price Price No. I -12 1 EA Type `A' Stormdrain Manhole Complete in Place _ - 4 0o J Dollars and Cents per EACH. I -13 1 EA Type `B' Stormdrain Manhole Complete in Place 70 000 2paOO Dollars and Cents per EACH. 1 EA Transition Structure to Connect I -14 36" RCP to existing structure 4Daoo 4- 0000 Complete in Place Dollars and Cents per EACH. 4 EA Lower existing 12" Water Line I -15 Complete in Place 3000 12-000 Dollars and Cents per EACH. 4 EA `Bridge' existing 12" Water Line I -16 Complete in Place Dollars an d Cents LS per EACH. Traffic Control I -17 1 Complete in Place '5000 Dollars and Cents per LUMP SUM. bOCr 6 1 -20 71 Bidding Documents MacArthur / Samuel Drainage DR 00 -01 UNIT PRICE BID SCHEDULE BASE BID Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -18 1040 LF Saw cut existing concrete for RCP Installation and 1 Su pavement repair i S Complete in Place Dollars and Cents per LINEAR FOOT. I -19 46 LF Curb Removal and Replacement (Includes saw cut) )C) 46 0 Complete in Place Dollars and Cents per LINEAR FOOT. I -20 r262 LF Pavement Repair S O "- Complete in Place 1 '� 10 0 Dollars and Cents per LINEAR FOOT. I -21 1 LS Repair Irrigation System Complete in Place 0 000 1000 Dollars and Cents per LUMP SUM. I -22 1 LS Sod / Hydro Mulch Complete in Place �SOO 2SU J Dollars and Cents per LUMP SUM. Z) ti Z. r TOTAL BID ITEMS BASE BID I -1 thru I -22 TANGIBLE PERSONAL PROPERTY COST 2-4 1-21 Bidding Documents