Loading...
SW0001-CS020708J4 WEEKLY PROJECT STATUS REPORT DATE: July 8 — July 12, 2002 PROJECT NO.: 2230 - 01.148 CLIENT: City of Coppell BY: Bradley J. Moss PROJECT: Riverchase Elementary School REVIEWED BY: Steve A. Markussen Date Item 07/09 1. SAM talked with Millican and he is finished with the redesign of the road and will forward the plan and profile to PK. 07/10 1. SAM received the plan and profile for Starleaf Street. 07111 1. Plans were revised to set grades on the sidewalk to correspond with the proposed top of curb for the roadway. 7/12 1. SAM called Millican and commented on the absence of a curb inlet @ STA 0 +00. Left message. cc: City of Coppell — Kenneth Griffin BJM /slt 2230 -26