SW0001-CS020909J4 WEEKLY PROJECT STATUS REPORT DATE: September 9 — September 13, 2002 PROJECT NO.: 2230 - 01.148 CLIENT: City of Coppell BY: Bradley J. Moss PROJECT: Riverchase Elementary School REVIEWED BY: Steve A. Markussen Date Item 09/09 1. BJM and SAM met with Mike Millican. Items discussed: a. PK is to verify hydraulics for the proposed culvert. b. Mike Millican is to meet with Ken Griffin to discuss if the Contractor putting in the proposed Starleaf Drive can install the box culvert. cc: City of Coppell — Kenneth Griffin BJM /slt 2230 -31