SW0001-CS020909J4
WEEKLY PROJECT STATUS REPORT
DATE:
September 9 — September 13, 2002
PROJECT NO.:
2230 - 01.148
CLIENT:
City of Coppell
BY:
Bradley J. Moss
PROJECT:
Riverchase Elementary School
REVIEWED BY:
Steve A. Markussen
Date Item
09/09 1. BJM and SAM met with Mike Millican. Items discussed:
a. PK is to verify hydraulics for the proposed culvert.
b. Mike Millican is to meet with Ken Griffin to discuss if the Contractor putting in the
proposed Starleaf Drive can install the box culvert.
cc: City of Coppell — Kenneth Griffin
BJM /slt
2230 -31