Loading...
First Assembly-CS030103Pastor Ron Culver 200 S. Heartz Road Coppell TX 75019 RE: Coppell First Assmebly of God Church Fee Assessment Letter Dear Pastor Culver: Sincerely, 11,, n Teresa M. Turner, E.I.T. Graduate Engineer vWX T H E C 1 T Y •O F COPPELL cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation Ken Griffin, Director of Engineering/Public Works January 3, 2003 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $243.05 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that are typically paid prior to Council approval. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. 255 PARKWAY P.O.BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 Project: Coppell First Assembly of God Date: 12/31/02 DEVELOPMENT FEE TABLE TOTAL FEES DUE AMOUNT DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee (100% due at Issuance of Building Permit) $1,400.00 Water Tap Inspection Fee (100% due at Issuance of Water Meter) $50.00 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) $0.00 Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) $142.10 Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) $0.00 Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) $30.00 Wastewater Impact Fee (100% due at Issuance of Building Permit) $0.00 Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) $0.00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $0.00 Park Fee (100% due prior to Council Approval) $0.00 $0.00 Roadway Impact Fee '(100% due prior to Council Approval) $243.05 $243.05 Street Light Fee (100% due prior to Acceptance of Project) Information not Available 11 Street Sign Fee (100% due prior to Acceptance of Project) Information not Available II Construction Inspection Fee (100% due prior to Start of Construction) Information not Available TOTAL $1,865.15 $243.05 I TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL Project: Coppell First Assembly of God Date: 12/31/02 DEVELOPMENT FEE TABLE PROJECT: Coppell First Assembly of God DATE: 12/31/02 DEVELOPMENT FEE WORKSHEET Water Impact Fee: Domestic Meter(s): 0 0 ESU's Irrigation Meter(s): 1 1 1/2 inch 5 ESU's 0 0 ESU's Fireline Meter(s): 0 0 ESU's Total 5 ESU's $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total 1 Connections $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0 Domestic Meter(s) $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total 1 Irrigation Meter(s) $142.10 Total 0 Additional Irrigation Meter(s) $0.00 Total 0 Fireline Meter(s) $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total 1 Wastewater Tap Inspection Fee: Total 0 Park Fee (For Residential Developments Only): Preliminary plat approved: Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 (Due prior to issuance of building permit) Connections $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0 Lots $50.00 ea. (100% due prior to issuance of building permit) After October 26, 1993 0 Single- family $0.00 per lot 0 Multi family $0.00 per unit (50% paid prior to Council approval of final plat) Page 1 $50.00 $0.00 $142.10 $0.00 $0.00 $0.00 $30.00 $280.00 ea. $0.00 $0.00 $0.00 $0.00 $0.00 DEVELOPMENT FEE WORKSHEET (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $243.05 Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 Information not Available Information not Available Information not Available Service Area 6 Category Institutional Land Use Church /Synagogue Building Area (sf) 1,558 Development Units 1.56 Vehicle Miles per Development Unit 0.52 Fee per Vehicle Mile $300 Roadway Impact Fee due (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $243.05 PROJECT: Coppell First Assembly of God DATE: 12/31/02 ROADWAY IMPACT FEE: ROADWAY IMPACT FEE CALCULATIONS (Figure 2 Roadway Impact Fee Study) (Table 3 Roadway Impact Fee Study) (Schedule 2, Page 3 Roadway Impact Fee Study) I.IU)1..\TDl!E .243 <(k5�