Loading...
PA9702-LR 990819 (2)UONCRETE COMPREL"31VE STRENGTH TES/' 8901 Caqle~te' D~ T~ 75~7 ~ate o~ Service: 0~/10/1~ Report No: 9921660 Report Da~ 0~/1~/1~ Client ~o.: COPPE~L Project ~o.: ~ 111 ~ Client: Cir~ o~Co pdl Proj~t: Coppell Aquatic~mation Arm: 732 DeForest 3~ Bl~k of P~kway Blvd Coppell TX 75019 Coppell, Texa~. ~51 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ati~ns~ff~requiredfie~dtestandcast compressive s~eng~ samples. PROJECT DATA CO~C~R: Hisaw & Ass~. CONC~ CLASS: 6 Sack CONC~TESUPPLIER: Nelson Brothers P~C~E~DA~: 08/10/1999 BATCHT~: 9:18am P~m: ~wisville T~ SAILED: 10:~am BY: Steve ~mp~ll SPECffICA~ON ~QUI~ME~ ~R COmmONS: Cle~ S~NG~: 4~ psi ~ 28 Days ~E~ ~ - AIR 90 F CONC~: 96 SLY: 5.0" Max TRUCK NO: 221 TIC~NO: 76316 Am: N/A AmCO~(~): N/A u~m~: N/A ~T ME~OD: ASTM C- 143 P~c~ WCAT~ON: G~de ~ ~und p~l ~d ASTM C-172 ASTM C-39 S~PLE ~CATION: Sou~ comer of atrium PORT OF TESTS ACC T E VA : 10 C~ER ~ASU~D ~ CO~S~ ~D SL~ DA~ AGE ~AD ST~G~ S~ NO. (h~) ~D (days) (1~. f~ce) ~) I I 5.~ 08/17/1999 7 127860 4520 I 2 5.~ 08/17/1999 7 122120 4320 Average ~20 I 3 5.~ 09/07/1999 28 I 4 5 .~ 09/07/1999 28 S~pled from p~p. T~ffi~n: Steve Camp~ll S~: 10:~m Fi~sh~: 12:3~m ~ Engineering, Inc. ~port D~tribution: ~ ~ C (1) Ci~ of~ppcll (l) City ofCop~ll - En~n~dng (I) Bfln~cy S~gcnt Arc~B (D City of~p~ll - Bldg. Insp. Eugene H~ (I) ~ ~g~ (l) Ci~ of Cop~ll - ~ S~ ~pt Vi~ ~csident (I) Hi~w & Ass~tes This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.