Loading...
Stratford Manor-LR000209FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 7522~ Ph (972) 484-8301; Fax (972) 620-7328 FIELD DENSITY REPORT Huie Construction Co. REPORT DATE: February 9, 2000 Stratford Manor, Coppell, Texas PROJECT NO.: 0791~2064 DATE PERFORMED: Februa~ 8, 2000 Density Test Method: Number 1 2 Description Reddish brown silty sandy clay with organics Reddish light brown sandy clay TEST PROCTOR NO. NO. 151 1 152 1 153 2 154 1 155 1 156 1 157 1 158 1 Remarks: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Maximum Dry Density (pct') Optimum Moisture (% 114.3 12.0 110.1 16.2 LOCATION TEST RESULTS UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSlT~ 111.1 15.2 97.1 117.1 13.3 102.4 105.5 17.7 95.8 111.0 13.3 97.1 115.4 14.0 100.9 109.5 13.4 95.7 111.2 12.5 97.3 111.5 13.8 97.5 Retest of Test #99 dated 6-10-99 Retest of Test #100 dated 6-10-99 Retest of Test #101 dated 6-10-99 Block B, Lot 6, final Block A, Lot 6, final Block A, Lot 5, final Block A, Lot 4, final Block A, Lot 3, final All densities meet project specifications unless otherwise noted. Mark Strittmatter Fugro South Technician SMH/bg Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: C-~'~t