Loading...
Stratford Manor-LR 990614FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: June 14, 1999 PROJECT NO.: 0791-2064 Page 1 DATE PERFORMED: June 11, 1999 Density Test Method: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (%) 1 Reddish light brown sandy clay 110.1 16.2 2 Medium brown, dark gray shale clay 92.3 25.4 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 102 1 Pads, Block A, Lot 1, 1st lift/final 104.9 18.7 95.2 103 1 Pads, Block A, Lot 2, 1st lift/final 106.9 16.8 97.0 104 1 Pads, Block A, Lot 15, 4th lift/final 104.4 17.4 95.0 105 1 Retest of #95 of 6-10-99 105.3 17.1 95.6 106 1 Retest of #96 of 6-10-99 106.2 17.3 96.4 107 1 Retest of #97 of 6-10-99 105.8 16.9 96.0 108 1 Retest of #98 of 6-10-99 107.3 16.3 97.4 109 1 Pads, Block B, Lot 11,3rd lift/final 108.6 16.5 98.6 110 1 Pads, Block B, Lot 12, 2nd lift/final 106.6 16.2 96.8 111 1 Pads, Block B, Lot 13, 2nd lift/final 105.7 17.9 96.0 112 1 Pads, Block B, Lot 14, 2nd lift/final 104.8 17.7 95.1 113 2 Paving subgrade, Block A & B, Lot 8 & 8, 89.3 23.1 96.7 natural Paving subgrade, Block A & B, Lot 8 & 8, 1st lift Paving subgrade, Block A & B, Lot 8 & 8, 2nd lift/final 8 inch water line Block A, Lot 1,3 feet below grade 8 inch water line Block A, Lot 1, 1 foot below grade 8 inch water line Block A, Lot 6, 3 feet below grade 8 inch water line, Block A, Lot 6, 1 foot below grade 8 inch water line, Block A, Lot 12, 6 feet below grade 8 inch water line, Block A, Lot 12, 4 feet below grade 114 1 107.5 19.2 97.6 115 1 109.3 18.5 99.2 116 1 106.3 16.6 96.5 117 1 106.1 16.3 96.3 118 1 105.2 17.1 95.5 119 1 106.9 16.8 97.0 120 1 107.7 16.3 97.8 121 1 106.2 16.5 96.4 FUGRO SOUTH, INC. CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 REPORT DATE: June 14,1999 PROJECT NO.: 0791-2064 Page 2 TEST NO. 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 PROCTOR NO. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LOCATION TEST RESULTS UNIT DRY WEIGHT 8 inch below 8 inch below 8 inch below 8 inch below 4 inch &1,4 4 inch &1,2 water line, Block A, Lot 6, 1 foot grade water line, Block A, Lot 12, 6 feet grade water line, Block A, Lot 12, 4 feet grade water line, Block A, Lot 12, 2 feet grade sanitary service, Block A & B, Lot 1 feet below grade sanitary service, Block A & B, Lot 1 feet below grade 4 inch sanitary serwce, Block A & B, Lot 5 & 5, 2 feet below grade 4 inch sanitary service, Block A & B, Lot 9 & 9, 2 feet below grade 4 inch sanitary serwce, Block A & B, Lot 13 & 13, 4 feet below grade 4 inch sanitary service, Block A & B, Lot 1 3 & 1 3, 2 feet below grade 1 inch water serwce, Block B, Lot 2, 1 foot below grade 1 inch water service, Block B, Lot 4, 1 foot below grade 1 inch water serwce, Block B, Lot 6, 1 foot below grade 1 inch water service, Block B, Lot 8, 1 foot below grade 1 inch water service, Block B, Lot 10, 1 foot below grade 1 inch water service, Block A, Lot 18, 1 foot below grade MOISTURE PERCENT OF CONTENT PERCENT MAXIMUM DENSITY 106.9 16.8 97.0 107.7 16.3 97.8 106.2 16.5 96,4 108.1 16.1 98.1 105.9 17.3 96.1 106.6 16.8 96.8 107.3 17,1 97.4 106.0 16.4 96.2 105.7 17.6 96.0 106.3 17~2 96.5 105.2 17.0 95.5 104.8 16.5 95.1 106.8 16.1 97.0 106.3 15.9 96.5 107.0 15.6 97.1 104.6 16.0 95.0 FUGRO SOUTH, INC. FIELD DENSITY REPORT 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: June 14,1999 PROJECT NO.: 0791-2064 Page 2 DATE PERFORMED: June 11, 1999 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 122 1 123 1 124 1 125 1 126 1 127 1 128 1 129 1 130 1 131 1 132 1 133 1 134 1 135 1 8 inch water line, Block A, Lot 12, 2 feet below grade 4 inch sanitary service, Block A & B, Lot 1 & 1,4 feet below grade 4 inch sanitary serwce, Block A & B, Lot 1 & 1, 2 feet below grade 4 inch sanitary serwce, Block A & B, Lot 5 & 5, 2 feet below grade 4 inch sanitary service, Block A & B, Lot 9 & 9, 2 feet below grade 4 inch sanitary service, Block A & B, Lot 13 & 13, 4 feet below grade 4 inch sanitary service, Block A & B, Lot 13 & 13, 2 feet below grade 1 inch water service Block B, Lot 2, 1 foot below grade 1 inch water service Block B, Lot 4, 1 foot below grade 1 inch water service Block B, Lot 6, 1 foot below grade 1 inch water service Block B, Lot 8, 1 foot below grade 1 inch water service Block B, Lot 10, 1 foot below grade 1 inch water service Block A, Lot 18, 1 foot below grade 1 inch water service Block A, Lot 16, 1 foot below grade 108.1 16.1 98.1 105.9 17.3 96.1 106.6 16.8 96.8 107.3 17.1 97.4 106.0 16.4 96.2 105.7 17.6 96.0 106.3 17.2 96,5 105.2 17.0 95.5 104.8 16.5 95.1 106.8 16.1 97.0 106.3 15.9 96.5 107.0 15.6 97.1 104.6 16.0 95.0 106.7 16.2 96.9 Remarks: All densities meet project specifications unless otherwise noted. William Granger Fugro South Technician SMH/bg Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: .... FUGRO SOUTH, INC. CLIENT: PROJECT: FIELD DENSITY REPORT 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: June 14,1999 PROJECT NO.: 0791-2064 Page 3 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 135 1 I inch water service, Block A, Lot 16, 1 106.7 16.2 96.9 foot below grade Remarks: All densities meet project specifications unless otherwise noted. *Revised to clarify location for Test Nos. 102, 103 and 109-112 William Granger Fugro South Technician SMH/bg Distribution: Huie Construction Co. ~ David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: 4~ FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: June 14, 1999 PROJECT NO.: 0791-2064 DATE PERFORMED: June 10, 1999 Density Test Method: Method of Compaction: ASTM D-698 ASTM D-2922 & 30'17 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (%) 1 Reddish brown silty sandy clay with organics 114.3 12.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO, NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 94 1 Block A, Lot 15, final 110.0 12.0 96.2 95 1 Block A, Lot 16, final 104.7 8.4* 91.5'* 96 1 Block A, Lot 17, final 105.7 7.3* 92.4** 97 1 Block A, Lot 18, final 107.3 5.5* 93.8** 98 1 Block B, Lot 10, final 109.7 7.6* 95.9 99 1 Block B, Lot 9, final 102.4 6.7* 89.5** 100 1 Block B, Lot 8, final 108.5 9.6* 94.9** 101 1 Block B, Lot 7, final 104.5 8.3* 91.4** Remarks: * Does not meet project specifications for percent moisture content. · * Does not meet project specifications for percent maximum dry density. Mark Strittmatter Fugro South Technician SMH/mv Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: June 14,1 999 PROJECT NO.: 0791-2064 Page 1 DATE PERFORMED: June 9, 1999 Density Test Method: Number 1 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Reddish light brown sandy clay TEST PROCTOR LOCATION NO. NO. Method of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) 110.1 TEST RESULTS UNIT DRY MOISTURE WEIGHT Optimum Moisture (%) 16.2 PERCENT OF CONTENT PERCENT MAXIMUM DENSITY 83 1 84 1 85 1 86 1 87 1 88 1 89 1 9O 1 91 1 92 1 93 1 48 inch storm sewer, Line "A", station 10+00, 3 feet below grade 48 inch storm sewer, Line "A", station 10+00, 1 foot below grade 24 inch storm sewer, Line "A-l", station 1+00, 3 feet below grade 24 inch storm sewer, Line "A-l, station 1+00, 1 foot below grade 10 inch sanitary sewer, Line "A", station 1 +00, 8 feet below grade 10 inch sanitary sewer, Line "A", station 1+00, 6 feet below grade 10 inch sanitary sewer, Line "A", station 1 +00, 4 feet below grade 10 inch sanitary sewer, Line "A", station 1 +00, 2 feet below grade 10 inch sanitary sewer, Line "A", station 4+00, 4 feet below grade 10 inch sanitary sewer, Line "A", station 4+00, 2 feet below grade 10 inch sanitary sewer, Line "A", station 7+00, 2 feet below grade 105.9 16.6 96.1 106.2 16.4 96.4 105.4 16.9 95.7 105.1 16.6 95.4 107.7 17.5 97.8 106.4 17.7 96.6 108.1 16.8 98.1 107.3 17.0 97.4 106.8 16.7 97.0 107.1 15.9 97.2 106.6 16.4 96.8 FUGRO SOUTH, INC. CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 REPORT DATE: PROJECT NO.: 0791-2064 Page 2 DATE PERFORMED: June 9, 1999 ] TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 94 1 10 inch sanitary sewer, Line "A", station 107.5 10+00, 2 feet below grade Remarks: Ail densities meet project specifications unless otherwise noted. William Granger Fugro South Technician SMH/bg Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs 15.5 97.6 FUGRO SOUTH INC. Reviewed By: