Stratford Manor-LR 990426FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
FIELD DENSITY REPORT
Huie Construction Co.
Stratford Manor, Coppell, Texas
REPORT DATE: April 26, 1999
PROJECT NO.: 0791-2064
DATE PERFORMED: April 22, 1999
Density Test Method:
Number
1
2
Description
Reddish brown silty sandy clay with organics
Red and light brown sandy clay
TEST PROCTOR
NO. NO.
45 1
46 1
47 1
48 2
49 2
5O 2
51 2
Remarks:
ASTM D-2922 & 3017 Method of Compaction: ASTM D-698
MOISTURE/DENSITY RELATIONS
Material Proctor Results
Maximum Dry Density (pct') Optimum Moisture (%)
114.3 12.0
110.1 16.2
LOCATION
TEST RESULTS
UNIT DRY MOISTURE PERCENT OF
WEIGHT CONTENT PERCENT MAXIMUM DENSITY
112.7 14.1 98.6
114.1 14.0 99.8
112.2 15.1 98.2
109.6 19.2 99.5
110.5 17.7 100.4
107.8 18.8 97.9
109.0 18.3 99.0
Block A, Lot 5, 1St lift
Block A, Lot 6, 3rd lift
Block A, Lot 7, 4~ lift
Block A, Lot 8, 3~ lift
Block A, Lot 9, 2"d lift
Block A, Lot 10, 1st lift
Block A, Lot 18, 2n~ lift
All densities meet project specifications unless otherwise noted.
Ted Nicholas
Fugro South Technician
FUGRO SOUTH INC.
SMH/mv
Distribution:
Huie Construction Co. - David A. Whitsett
Alton Loyd, Inc. - Preston Skaggs
Reviewed By: ~ =