Loading...
Stratford Manor-LR 990422FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas REPORT DATE: April 22, 1999 PROJECT NO.: 0791-2064 DATE PERFORMED: April 20, 1999 Density Test Method: Number 1 2 Description Reddish brown silty sandy clay with organics Red and light brown sandy clay TEST PROCTOR NO. NO. 37 2 38 2 39 2 4O 2 41 2 42 2 43 1 44 1 Remarks: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Maximum Dry Density (pcf) Optimum Moisture (%) 114.3 12.0 110.1 16.2 LOCATION TEST RESULTS UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 105.3 17.4 95.6 106.2 16.8 96.4 105.9 16.6 96.1 106.4 16,3 96.6 105.7 16.5 96.0 105.5 17.9 95.8 110.9 14.4 97.0 109.6 15.1 95.8 Block B, Lot 6, natural Block A, Lot 7, 3rd lift Block A, Lot 8, 2® lift Block A, Lot 11, natural Block A, Lot 12, natural Block A, Lot 13, natural Block A, Lot 14, natural Block A, Lot 15, natural All densities meet project specifications unless otherwise noted. William Granger Fugro South Technician SMH/mv Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: FUGRO SOUTH, INC. CLIENT: PROJECT: FIELD DENSITY REPORT Huie Construction Co. Stratford Manor, Coppell, Texas 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 REPORT DATE: April 22, 1999 PROJECT NO.: 0791-2064 DATE PERFORMED: April 19, 1999 Density Test Method: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (%) 1 Dark brown silty sandy clay with organics 113.8 14.5 2 Reddish light brown sandy clay 110.1 16.2 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 33 1 Block A, Lot 9, natural 110.2 16.3 96.8 34 2 Block A, Lot 18, 1s~ lift 108.4 16.5 98.4 35 2 Block A, Lot 10, natural 109.5 16.8 99.5 36 2 Block A, Lot 9, 1st lift 106.8 15.8 97.0 Remarks: All densities meet project specifications unless otherwise noted. Mike Flute Fugro South Technician SMH/mv Distribution: Huie Construction Co. - David A. Whitsett Alton Loyd, Inc. - Preston Skaggs FUGRO SOUTH INC. Reviewed By: "'""~