Stratford Manor-LR 990422FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
FIELD DENSITY REPORT
Huie Construction Co.
Stratford Manor, Coppell, Texas
REPORT DATE: April 22, 1999
PROJECT NO.: 0791-2064
DATE PERFORMED: April 20, 1999
Density Test Method:
Number
1
2
Description
Reddish brown silty sandy clay with organics
Red and light brown sandy clay
TEST PROCTOR
NO. NO.
37 2
38 2
39 2
4O 2
41 2
42 2
43 1
44 1
Remarks:
ASTM D-2922 & 3017 Method of Compaction: ASTM D-698
MOISTURE/DENSITY RELATIONS
Material Proctor Results
Maximum Dry Density (pcf) Optimum Moisture (%)
114.3 12.0
110.1 16.2
LOCATION
TEST RESULTS
UNIT DRY MOISTURE PERCENT OF
WEIGHT CONTENT PERCENT MAXIMUM DENSITY
105.3 17.4 95.6
106.2 16.8 96.4
105.9 16.6 96.1
106.4 16,3 96.6
105.7 16.5 96.0
105.5 17.9 95.8
110.9 14.4 97.0
109.6 15.1 95.8
Block B, Lot 6, natural
Block A, Lot 7, 3rd lift
Block A, Lot 8, 2® lift
Block A, Lot 11, natural
Block A, Lot 12, natural
Block A, Lot 13, natural
Block A, Lot 14, natural
Block A, Lot 15, natural
All densities meet project specifications unless otherwise noted.
William Granger
Fugro South Technician
SMH/mv
Distribution:
Huie Construction Co. - David A. Whitsett
Alton Loyd, Inc. - Preston Skaggs
FUGRO SOUTH INC.
Reviewed By:
FUGRO SOUTH, INC.
CLIENT:
PROJECT:
FIELD DENSITY REPORT
Huie Construction Co.
Stratford Manor, Coppell, Texas
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
REPORT DATE: April 22, 1999
PROJECT NO.: 0791-2064
DATE PERFORMED: April 19, 1999
Density Test Method: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698
MOISTURE/DENSITY RELATIONS
Material Proctor Results
Number Description Maximum Dry Density (pcf) Optimum Moisture (%)
1 Dark brown silty sandy clay with organics 113.8 14.5
2 Reddish light brown sandy clay 110.1 16.2
TEST RESULTS
TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF
NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY
33 1 Block A, Lot 9, natural 110.2 16.3 96.8
34 2 Block A, Lot 18, 1s~ lift 108.4 16.5 98.4
35 2 Block A, Lot 10, natural 109.5 16.8 99.5
36 2 Block A, Lot 9, 1st lift 106.8 15.8 97.0
Remarks: All densities meet project specifications unless otherwise noted.
Mike Flute
Fugro South Technician
SMH/mv
Distribution:
Huie Construction Co. - David A. Whitsett
Alton Loyd, Inc. - Preston Skaggs
FUGRO SOUTH INC.
Reviewed By: "'""~