Loading...
ST9905-CS020327From: To: Date: Subject: <ccbond@transystems.com> City_of_CoppelI.Town_Center(staylor) Wed, Mar 27, 2002 9:48 AM RE: Bethel Road Suzan, Yes, he needs to mark their location, determine if any conflict exists and get the information back to us. If their cable was not marked, or was possibly included in someone eises duct bank, it would not have been picked up during the survey and included in the plans. I also sent the plans to TC Keith, a contract inspector for Touch America, who was going to indicate any conflicts and get the information back to me. To date we have not recieved anything from TC Keith. I believe I gave TC Keith's phone number to Don Jackson so they could coordinate their effort. Don Jackson is a local maintenance person and TC Keith apparently works for their engineering group (Powers Engineers) out of Denver. Craig ..... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppelhtx. us] Sent: Wednesday, Mamh 27, 2002 8:22 AM To: DL-Charles Bond Subject: Bethel Road Craig: Don Jackson with Touch America contacted the City to let us know that the plans that were sent on 03/11 did not show their fiber location. Did the utility plans necessarily show the location of all the known utilities in the vicinity of the project? Since the fiber optic location is not shown, doesn't he need to show the location of the fiber optic on the plans, provide your firm with any as-built records of the fiber optic, and make a determination as to whether the fiber optic will need to be relocated. Thanks