Loading...
PA9702-LR 990909 CONCRETE COMPRg HVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 08/10/1999 Report No.: 9921660 09/09/1999 Client No.: COPPELL Project No.: 94991118 Client: Cky of Coppell Project: Coppell Aquatic/Recreation Ctr A~: Brad Reid 300 Block ofP~kway Blvd 732 DeForest Coppoll TX 75019 Coppe11, Texas/Prj. ~9605 Services: ~btainsamp]~s~ffrcshc~ncreteatthep~acement1~cati~ns~perf~required~dtestandcast compressire s~ength samples. PROJECT DATA CONT~CTOR: ~S~W ~ ASSOC. CONCRETE CLASS: 6 CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 08/10/1999 BATCH TIME: PLANT: LewtsvH]e TIME SAMPLED: ~0:00R~ BY: Steve SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: STRENGTH: 4000 pSj ~ 28 Days TEMPE~TURE (F) - AIR 90 F CONCRETE: 96 F SLUMP: ~ .0" Max TRUCK NO: 221 T~C~T NO: 76316 AIR: N/~ AIRCONTENT(%): N/A UNIT WEIGHT ~c0: TEST METHOD: ~ST~ C-]43 PLACEMENT L~ATION: Gnde beams around pool and a~um ASTM C-172 ASTM C-39 SAMPLE LOCATION: South co~er of atrium PORT OF TESTS ACCUMULATIVE YA~S: CYLINDER MEnURED M~IMUM COMPRESSIVE MAR~D SLUMP DATE AGE LOAD STRENGTH F~URE SET NO. (inch~) TESTED (days) 0b~ force) ~si) ~PE I 1 5.00 08/17/1999 7 127860 4520 I 2 5.00 08/17/1999 7 122120 4320 Average 4420 1 3 5.00 09/07/1999 28 152180 5380 1 4 5.00 09/07/1999 28 153780 5440 Average M10 Technician: Steve Campbell Sta~ed: 10:00fl~ Finished: 12:30pro ~ E~ing, Inc. Repo~ Distribution: (1) City of Coppell (1) City ofCop~l] - Engineering (I) BrinkIcy Sargent Archikers (I) Cky ofCoppell - Bldg. Insp. Eugene Harbour (1) Turner Enginee~ (I) C~ty ofCoppelI - Leisure Serv Dcpt Vice President ( I ) Hisaw & Associates This report is exclusively tbr the use of the cl lent indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of I · r I I i