PA9702-LR 990909 CONCRETE COMPRg HVE STRENGTH TES
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 08/10/1999 Report No.: 9921660 09/09/1999
Client No.: COPPELL Project No.: 94991118
Client: Cky of Coppell Project: Coppell Aquatic/Recreation Ctr
A~: Brad Reid 300 Block ofP~kway Blvd
732 DeForest
Coppoll TX 75019 Coppe11, Texas/Prj. ~9605
Services: ~btainsamp]~s~ffrcshc~ncreteatthep~acement1~cati~ns~perf~required~dtestandcast
compressire s~ength samples.
PROJECT DATA
CONT~CTOR: ~S~W ~ ASSOC. CONCRETE CLASS: 6
CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 08/10/1999 BATCH TIME:
PLANT: LewtsvH]e TIME SAMPLED: ~0:00R~ BY: Steve
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS:
STRENGTH: 4000 pSj ~ 28 Days TEMPE~TURE (F) - AIR 90 F CONCRETE: 96 F
SLUMP: ~ .0" Max TRUCK NO: 221 T~C~T NO: 76316
AIR: N/~ AIRCONTENT(%): N/A UNIT WEIGHT ~c0:
TEST METHOD: ~ST~ C-]43 PLACEMENT L~ATION:
Gnde beams around pool and a~um
ASTM C-172
ASTM C-39
SAMPLE LOCATION: South co~er of atrium
PORT OF TESTS ACCUMULATIVE YA~S:
CYLINDER MEnURED M~IMUM COMPRESSIVE
MAR~D SLUMP DATE AGE LOAD STRENGTH F~URE
SET NO. (inch~) TESTED (days) 0b~ force) ~si) ~PE
I 1 5.00 08/17/1999 7 127860 4520
I 2 5.00 08/17/1999 7 122120 4320
Average 4420
1 3 5.00 09/07/1999 28 152180 5380
1 4 5.00 09/07/1999 28 153780 5440
Average M10
Technician: Steve Campbell Sta~ed: 10:00fl~ Finished: 12:30pro ~ E~ing, Inc.
Repo~ Distribution:
(1) City of Coppell (1) City ofCop~l] - Engineering
(I) BrinkIcy Sargent Archikers (I) Cky ofCoppell - Bldg. Insp. Eugene Harbour
(1) Turner Enginee~ (I) C~ty ofCoppelI - Leisure Serv Dcpt Vice President
( I ) Hisaw & Associates
This report is exclusively tbr the use of the cl lent indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page I of I