Loading...
ST0001-CS020425 (2)Suzan Creekview Pac From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppelLtx.us> Thu, Apr 25, 2002 4:03 PM RE: Creekview Suzan, Billy, Dennis and I met on site this morning at 10:00. We were probably out there until around 10:30 or 10:45. They didn't have any questions for me. We just discussed the schedule a little. I did go down and look at the entry drive to Wagon Wheel. There is quite a hill on the North side. I don't believe there were any plans to take the sidewalk past the limits of the concrete paving. Billy put in the curb cut for the HC ramp. That whole are will need to be re-graded and the fence relocated. I'm not sure if we want to mess with that at this point. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX .... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us] Sent: Wednesday, April 24, 2002 8:03 AM To: cschnitger@sradesign.com Subject: Re: Creekview Chris: They have not completed the eastbound lanes of Creekview yet. They started last Friday. They submitted a time-line on rain days yesterday. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 04/23/02 03:02PM >>> Suzan, Do you know how ISI is coming along with their paving on Creekview? We are just about finished with the sidewalk plans. I plan on bringing plans to the meeting on Thursday. I was just curious as to how ISI was coming along. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX