ST0001-CS020425 (2)Suzan Creekview Pac
From:
To:
Date:
Subject:
"Schnitger, Chris" <cschnitger@sradesign.com>
'Suzan Taylor' <staylor@ci.coppelLtx.us>
Thu, Apr 25, 2002 4:03 PM
RE: Creekview
Suzan,
Billy, Dennis and I met on site this morning at 10:00. We were probably out
there until around 10:30 or 10:45. They didn't have any questions for me.
We just discussed the schedule a little. I did go down and look at the
entry drive to Wagon Wheel. There is quite a hill on the North side. I
don't believe there were any plans to take the sidewalk past the limits of
the concrete paving. Billy put in the curb cut for the HC ramp. That whole
are will need to be re-graded and the fence relocated. I'm not sure if we
want to mess with that at this point.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
.... Original Message ....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us]
Sent: Wednesday, April 24, 2002 8:03 AM
To: cschnitger@sradesign.com
Subject: Re: Creekview
Chris:
They have not completed the eastbound lanes of Creekview yet. They started
last Friday. They submitted a time-line on rain days yesterday.
>>> "Schnitger, Chris" <cschnitger@sradesign.com> 04/23/02 03:02PM >>>
Suzan,
Do you know how ISI is coming along with their paving on Creekview? We are
just about finished with the sidewalk plans. I plan on bringing plans to
the meeting on Thursday. I was just curious as to how ISI was coming along.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX