ST0001-CS020308From:
To:
Date:
Subject:
"SchnJtger, Chris" <cschnitger@sradesign.com>
'Suzan Taylor' <staylor@ci.coppell.tx.us>
Fri, Mar 8, 2002 10:10 AM
RE: Creekview Drive
I'll keep an eye out for it. I've got the first copy sitting here on my
desk.
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us]
Sent: Friday, March 08, 2002 10:07 AM
To: cschnitger@sradesign.com
Subject: RE: Creekview Drive
Chris:
Larry has requested Philip to resubmit the "road base under asphalt" letter
since it does not clearly explain what they had discussed. Be aware that a
new letter is coming.
>>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/07/02 03:07PM >>>
I'll let you know as soon as I get it.
I know that ISI took some shots along the gabions also and Philip told me
that most of the gabions are located below the top of curb elevation. There
is one location where the gabions are approximately 9" above the proposed
top of curb. We will verify this once we get our survey information in.
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Thursday, March 07, 2002 3:01 PM
To: cschnitger@sradesign.com
Subject: RE: Creekview Drive
I may have misunderstood Larry about which road they were ready to lime
stabilize. Larry wanted the survey information that was taken along
Creekview, if it was ready.
>>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/07/02 03:00PM >>>
Suzan,
I'm a little confused. I assume you are talking about Freeport Parkway?
Philip said they are planning on stabilizing Freeport Parkway in the next
few days, but our surveyor's didn't survey anything along Freeport Parkway.
All I had them do was verify the elevation of the gabions and shoot cross
sections of the "humped" areas on the east end of Creekview Drive.
I don't have any information from our surveyor's yet.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message ....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us]
Sent: Thursday, March 07, 2002 2:51 PM
To: cschnitger@sradesign.com
Subject: Creekview Drive
Chris:
I understand that your field party was at Creekview yesterday. Is the
survey data for the centerline and gabion walls available for us to review.
The dirt contractor is taking shots on the north and south curb lines and
the contractor may be ready to lime stabilize as early as next Monday, so we
need to review the information as soon as possible.
Thanks