Loading...
ST0001-CS020308From: To: Date: Subject: "SchnJtger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Fri, Mar 8, 2002 10:10 AM RE: Creekview Drive I'll keep an eye out for it. I've got the first copy sitting here on my desk. Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us] Sent: Friday, March 08, 2002 10:07 AM To: cschnitger@sradesign.com Subject: RE: Creekview Drive Chris: Larry has requested Philip to resubmit the "road base under asphalt" letter since it does not clearly explain what they had discussed. Be aware that a new letter is coming. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/07/02 03:07PM >>> I'll let you know as soon as I get it. I know that ISI took some shots along the gabions also and Philip told me that most of the gabions are located below the top of curb elevation. There is one location where the gabions are approximately 9" above the proposed top of curb. We will verify this once we get our survey information in. Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Thursday, March 07, 2002 3:01 PM To: cschnitger@sradesign.com Subject: RE: Creekview Drive I may have misunderstood Larry about which road they were ready to lime stabilize. Larry wanted the survey information that was taken along Creekview, if it was ready. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/07/02 03:00PM >>> Suzan, I'm a little confused. I assume you are talking about Freeport Parkway? Philip said they are planning on stabilizing Freeport Parkway in the next few days, but our surveyor's didn't survey anything along Freeport Parkway. All I had them do was verify the elevation of the gabions and shoot cross sections of the "humped" areas on the east end of Creekview Drive. I don't have any information from our surveyor's yet. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us] Sent: Thursday, March 07, 2002 2:51 PM To: cschnitger@sradesign.com Subject: Creekview Drive Chris: I understand that your field party was at Creekview yesterday. Is the survey data for the centerline and gabion walls available for us to review. The dirt contractor is taking shots on the north and south curb lines and the contractor may be ready to lime stabilize as early as next Monday, so we need to review the information as soon as possible. Thanks