ST0001-CS020306 (2)From:
To:
Date:
Subject:
Suzan,
"Schnitger, Chris" <cschnitger@sradesign.com>
'Suzan Taylor' <staylor@ci.coppell.tx. us>
Wed, Mar 6, 2002 3:37 PM
RE: Chris:
I just spoke with Philip at ISl. Here are the issues that we discussed:
1. At our meeting on Thursday with Ken we discussed the fence issue. ISI
submitted a cost of $22,000 on 2-15-02 to remove the fence and the remaining
trees. Ken asked them to review their costs and submit a new estimate.
Philip said he faxed copies of the new estimate this morning. I haven't had
a chance to look at it yet. It is SRA's recommendation that the 4:1 slope
begin at the back of curb. We are currently marking up plans to see what
effect this will have on the existing fence.
2. Philip said that he spoke with Jim Phillips at TXU this morning and as
far as he knows they have all the information that they need to install the
street light conduit. All conduit in the medians and the parkways will be
installed 18" below top of sub grade. This should provide enough clearance
for any future drive approaches.
3. Larry was also concerned with the existing power pole at the west end of
the job that is clearly located within the future radius. Jim Phillips met
with ISI on site today to discuss the relocation of this pole. As of now
ISI does not know if this will result in a loss of power in this area.
4. Larry was also concerned about the existing landscaping and irrigation
on the west end of the project. Philip has assured me that they have
contacted the businesses in this area and made them aware of the
construction in the area. ISI is also aware that they are going to have to
relocate some of the existing landscaping and repair some of the existing
irrigation in the area.
5. Our surveyor went out to Creekview today to survey the "humped" areas
near the soccer fields to verify that our revised sidewalk design will work.
Brad Reid in the Parks Dept. has already reviewed the plan and OK'd it.
Once we verify the elevations we will finish up the sidewalk plans and get
them to the City ASAP.
6. Philip also said that he had the top of the gabions surveyed to check
their elevation against the top of curb elevation. Larry was concerned that
the elevation of the gabions might be significantly higher than the top of
curb. Philip indicated that there was one area that showed the gabions to
be 9" higher than the proposed top of curb.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Wednesday, March 06, 2002 3:01 PM
To: cschnitger@sradesign.com
Subject: Chris:
Chris:
Larry received a phone call today form Dennis Hammock with ISl. He is
requesting information on the disposition of the exisiting fence located the
south property line of Creekview. He has indicated that he has sufficient
manpower and equipment on site to clear the fence and complete the
excavation and 4:1 slope as indicated on the construction plans. If you
have any additional information on the removal of the fence and the proposed
4:1 slope easement since our meeting on Thursday, Feb. 28, please advise.
From:
To:
Date:
Subject:
"Schnitger, Chris" <cschnitger@sradesign.com>
'Suzan Taylor' <staylor@ci.coppelhtx. us>
Wed, Mar 6, 2002 2:01 PM
RE: Creekview
Let me call Philip before you talk to Larry. ISI needs to do a better job
of obtaining this information from TXU. I've given them all the names and
numbers of the people they need to contact at TXU.
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Wednesday, March 06, 2002 11:53 AM
To: cschnitger@sradesign.com
Subject: RE: Creekview
Larry is the one who told me that the electrician did not have all that he
needed. I will give Larry a copy of your e-mail and see how he wants to
proceed.
>>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/06/02 11:44AM >>>
Suzan,
Larry told me that you were out. You missed all the fireworks on Thursday!
We discussed the electrical conduit issue at our site visit last week.
Apparently the inspector for TXU doesn't know what specs to use either. I
think we agreed on site that we would abide by the electrical code and go
with it. Billy, the superintendent, seemed to think that all the electrical
questions had been answered. Do you know if there were any specifications
in the plans for the other portion of Freeport Parkway that might address
the street lighting?
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
..... Original Message ....
From: Suzan Taylor [mailto:staylor@chcoppell.tx.us]
Sent: Wednesday, March 06, 2002 11:33 AM
To: cschnitger@sradesign.com
Subject: Re: Creekview
Chris:
I will tell Larry. I was out sick several days last week myself. Did you
ever the design information from Jim Phillips for the conduit. The sub for
ISI still does not have anything.
>>> "Schnitger, Chris" <cschnitger@sradesign.com> 03/06/02 08:16AM >>>
Suzan,
I just wanted to give you and update on the sidewalk issue. I had told
Larry that I would have something for him on Monday. The Landscape
Architect in our office that is working on the Tennis Center at Wagon Wheel
Park met with Brad Reid in Parks on Monday to go over some conceptual
drawings that he put together on the sidewalk. I've been out sick the last
two days I need to see what the outcome of that meeting was. Once I find
out what Brad said I will let you know when I expect to have some plans put
together.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX