Loading...
ST0001-CS020226 (3)i: S. uzan T~ylor - RE: Creekwew Page 1 From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> '$uzan Taylor' <staylor@ci.coppell.tx. us> Tue, Feb 26, 2002 9:26 AM RE: Creekview Suzan, I will be there at 8:30. Is there any way that you could let me know what the City's position will be on these issues so that I am prepared. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. VV.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us] Sent: Tuesday, February 26, 2002 9:16 AM To: cschnitger@sradesign.com Subject: RE: Creekview Chris: There is a regularly scheduled site meeting this Thursday, February 28th. Ken Griffin, and others in this office would like to meet prior to the site meeting to discuss the slope grading outside of the ROW, as well as other outstanding issues related to this project. I have faxed Philip a notice of the meeting and asked him and any others to attend. Would you be available to meet Thursday morning at 8:30 at the City offices? Please let me know if you are available. Thanks >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02/25/02 04:45PM >>> Here it is. I faxed a copy to Philip and told him that you would be adding the blow offs to the list. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX .... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, February 25, 2002 4:40 PM To: cschnitger@sradesign.com Subject: RE: Creekview Chris: Every place on the plans that pavers are indicated we will need a price and that will include the median noses. I somehow lost the Change Order No. 2 attachment you sent me, could you resent that so that I can make the changes and give to Paula to final. Thanks >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02~25~02 04:25PM >>> I was just reading through the material you sent me on the stamped concrete. Are ALL the pavers to be removed from the job? Including the ones in the median noses? Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, February 25, 2002 4:17 PM To: cschnitger@sradesign.com Subject: RE: Creekview Thanks Could I get an electronic file of plan drawings 13 through 18. Eddie Johnson is trying to put together all of the existing water lines for our bond information. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02/25/02 03:51PM >>> I called Philip and I am going to fax him the pertinent information regarding the stamped pavement and then I will mail him a copy of the entire letter. He said is shouldn't be a problem to get and estimate together. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX .... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, February 25, 2002 3:02 PM To: cschnitger@sradesign.com Subject: RE: Creekview I will add the deletion of the blow-off assembly valves and give to Paula to final. It is my understanding that they want to have stamped concrete from this time forward. If the proposal is too high then they may consider staying with the pavers, but I was instructed to get a cost. Thanks >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02/25/02 02:50PM >>> I will try and have some sidewalk plans by the end of the week. With regards to the blow off valves being deleted with Change Order #2, that is up to the City. Regardless of whether they remain in the Contract or taken out, the Contractor will not get paid for them. I will fax over an approved copy of Pay Estimate #2. I got your letter today regarding the stamped concrete. Am I to understand that all the locations where we have paver bands IN the street paving that they are to be stamped concrete instead? I$1 is currently pouring the pavement for Freeport Parkway and asking ISI to revise these sections will most likely delay construction. I will forward the information on to ISI and ask them to prepare a proposal. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, February 25, 2002 10:30 AM To: cschnitger@sradesign.com Subject: Re: Creekview I checked the math and it looks fine. I think that the deletion of the 3 blow-off assembly valves (Item 311) should be added to the change order, do you agree? Larry has requested that you fax a copy of the pay estimate #2 over with your approval noted on it for our files. Also do you know the status of the plans for the sidewalk? Larry is needing to know the proposed locations as soon as possible. Thanks >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02/24/02 11:38AM >>> Suzan, Here is a copy of Change Order ~2. Please double check my math. ISI has already seen a copy, marked it up and returned it. If the numbers are right then it should be good to go. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX