ST0001-CS020220 (3)From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Wed, Feb 20, 2002 10:37 AM RE: Sidewalks Suzan, I just spoke to Philip at ISI regarding the sidewalk and TXU. We don't have the revised sidewalk plans prepared yet. I told Philip that we are planning on getting them some plans before they begin paving Creekview. At this point it is not critical that they have the entire sidewalk realignment for TXU to locate their pullbox. I am going to send Philip a fax indicating the areas where TXU can place their pullbox. We can relocate the sidewalk to avoid the pullbox if necessary. We have room at the intersection to be creative with the sidewalk. Basically the ramp needs to remain where it is. TXU is free to put the pullbox on either side of the ramp inside the right-of-way. ISl is also concerned about the median island for the right turn lane. They are planning on paving that area within the next few days. It sounds like the City is asking us to provide a new design for that median to lower it to 3". This is going to require some time and I'm sure ISI is going to ask for more money. If the City is dead set against the 6" raised median then the City needs to instruct ISI to pave around that median and place a leave out so that we can properly design and alternate. Philip plans on having ALL the paving in by the end of March. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Wednesday, February 20, 2002 9:52 AM To: cschnitger@sradesign.com Subject: Sidewalks Chris: Larry visited the job site yesterday and noticed that TXU is in the process of relocating the existing underground conduit at Creekview Drive and Freeport Parkway. The pull box that TXU is going to install is fairly large and must be accessed from the surface. The location that has been marked for the installation is either in or very near the proposed conjuction of the 5-foot sidewalk along Freeport and the 6-foot sidewalk along Creekview. Larry had some concerns that the elevation and location of the pull box would interfere and encroach on the proposed sidewalk and ADA ramp. He and Billy made every effort to verify the posssible conflict. In the Feb. 14th site meeting, there was a discussion about plans for the proposed sidewalk. The existing plans do not show the the correct ADA ramp and elevation. We need the plans for the proposed sidewalk as quickly as possible. TXU wants to start the relocation tomorrow, however due to %-[ co-o( electrical outages to the park, that may not be possible. Suzan oo o\ From; To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Wed, Feb 20, 2002 4:35 PM RE: Sidewalks Sounds good. Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Wednesday, February 20, 2002 12:12 PM To: cschnitger@sradesign.com Subject: RE: Sidewalks I just talked with Larry and ISI has already poured the 6-inch curb island. Larry had concerns about cars hitting the island and incurring damage to their cars, but since the island meets TXDOT standards - no problem. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 02/20/02 10:39AM >>> Suzan, I just spoke to Philip at ISI regarding the sidewalk and TXU. We don't have the revised sidewalk plans prepared yet. I told Philip that we are planning on getting them some plans before they begin paving Creekview. At this point it is not critical that they have the entire sidewalk realignment for TXU to locate their pullbox. I am going to send Philip a fax indicating the areas where TXU can place their pullbox. We can relocate the sidewalk to avoid the pullbox if necessary. We have room at the intersection to be creative with the sidewalk. Basically the ramp needs to remain where it is. TXU is free to put the pullbox on either side of the ramp inside the right-of-way. ISI is also concerned about the median island for the right turn lane. They are planning on paving that area within the next few days. It sounds like the City is asking us to provide a new design for that median to lower it to 3". This is going to require some time and I'm sure ISI is going to ask for more money. If the City is dead set against the 6" raised median then the City needs to instruct ISI to pave around that median and place a leave out so that we can properly design and alternate. Philip plans on having ALL the paving in by the end of March. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX .... Original Message .... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us]