Loading...
ST0001-CS020115From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Tue, Jan 15, 2002 4:45 PM RE: Gabions Suzan, I just received a fax from ISI requesting a letter approving the gabion wall revisions. I've already put together a letter to that affect, but I just wanted to check with you before I send a copy to both you and ISl. I've already approved both revisions verbally. The total change comes to $11,953.62. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX .... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Tuesday, January 15, 2002 1:06 PM To: cschnitger@sradesign.com Subject: RE: Gabions Chris: I have not seen a letter, but I do not always see letters that are addressed to Ken. I will check with him when he gets back and let you know. I know that the issue has not been resolved yet. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 01/15/02 11:50AM >>> Suzan, Do you know if you or Ken ever received a letter from ISI regarding the removal of the trees and the filling of the stock pond? I know that ISI is still expecting to get paid for that work. I assume we are going to get Change Order No. 2 started at some point for the additional gabions. It would be nice to include everything in this next change order so that we have a clean slate. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Tuesday, January 15, 2002 8:10 AM To: csch nitger@sradesign.com Subject: RE: Gabions I have the information. Thanks >>> "Schnitger, Chris" <cschnitger@sradesign.com> 01/14/02 05:01PM >>> Suzan, I just faxed you some information. The first letter is from ISI and Olden regarding the first revision to the gabions, along with the sketch that they provided. The second is a letter from ISI to T×U regarding a line they encountered on site. I spoke with TXU today and they have resolved the issue already. The third letter is from ISI and Olden regarding the latest revision to the gabions that I discussed with Olden this morning. Overall the gabion quantity has increased by 89.5 cubic yards for a total cost increase of $11,953.62. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX