Loading...
ST0001-CS011213 (3)From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Thu, Dec 13, 2001 2:28 PM RE: Creekview Thanks Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx. us] Sent: Thursday, December 13, 2001 2:15 PM To: cschnitger@sradesign.com Subject: Re: Creekview I am preparing the meeting notes from todays meeting and I will fax the meeting notes and the TXU information to you this afternoon. >>> "Schnitger, Chris" <cschnitger@sradesign.com> 12/13 2:11 PM >>> Suzan, Larry said that you could fax me a copy of the information you got for TXU regarding the street lights. He said he wanted me to take a look at it to make sure we have everything covered. I told him I would talk to Philip at ISI regarding the deletion of the street lights from the contract. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX CREEKVIEW DRIVE & FREEPORT PARKWAY ST 00-01 December 13, 2001 Construction Meeting Comments 1.Barrier free ramp at Station 27+26 refers to detail on Sheet 22. The sidewalk has been revised at the intersection and the detail on sheet 22 is no longer applicable. Should this barrier free ramp should also reference SD-7. 2.Parks and Leisure will eventually construct a fence on the north side of Creekview Drive. Fences are usually constructed along the right-of-way line. The sidewalk in the areas of 1+50 to 4+00 and 20+00 to 23+00 will conflict with a fence constructed along the right-of-way. We need to determine the location of the fence in these two areas. 3.STREET LIGHT FOUNDATIONS TXU DETAIL 213-330  Install all conduit per TXU contract specifications.  Install all street light foundations per TXU contract specifications.  Install all wiring and connections per TXU contract specifications.  TXU to provide layout design for all overhead lights AND place on foundations.  TXU to make all electrical connections and power up.  TXU inspector needs to be on-site when the cable is laid. ISI needs to call either 972-253-2466 or 972-570-4135 several days before the work is to be done so that the TXU inspectors can schedule their time. 4.Approval of rain days requested by the contractor. 5.Cost of fence. 6.Tree removal outside of the limits of the right-of-way in the area of the stock pond.