Loading...
ST0001-CS011203 (3)From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> 'Suzan Taylor' <staylor@ci.coppell.tx.us> Mort, Dec 3, 2001 2:52 PM RE: Creekview Drive & Freeport Parkway Suzan, I'll have to check the plans and take a look at the cut sheets. We did not plan on placing any fill on the property to the East of Freeport Parkway when we did our quantities. Chris ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, December 03, 2001 1:42 PM To: cschnitger@sradesign.com Subject: Creekview Drive & Freeport Parkway Chris: Larry met with the contractor today. The contractor says their cut sheets indicate approximately 11,000 CY of excavation on the project as opposed to the 6500 CY as shown on the bid sheet. The contractor will send a copy of their cut sheets to you and let you determine whether they have a bust in their grades or there is a mistake in the bid quantity. Does the 3000 CY of roadway fill shown in the bid quantities include the fill on the east side of Freeport Parkway. It is not indicated as compacted fill on Sheet 8 of the plans. The contractor thinks that it is not included. Thanks Suzan ~ 00~0~