Loading...
Wynnpage Plaza-CS021217Dec 17 O~ 1~:~8p p.1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS From: Date: RE: Rick O'Deli, Construction Inspector En~necring Danny Hightower, Utilities Division December 17, 2002 Walk-thru Wynnpage Phase Il 1. JPaint sewer deanout lid red. 2. / Reset sewer cleanout so plug will come out. 3. / Need 18" X 18" pad on valve to vault. 4. ~/Vault needs drainage around top of vault. 5. V/Need paperwork on DC in vault, domestic & 2" DC and irrigation. 6. / Blocking under valves in vault. 7. / Brass plugs in vault (small-4). 8. ~/Curb stop cut off on 2' meters cut to ground high and capped. 9. ~/Brass plugs in dom. & irr. DC. 10. ~/ Letter from landscaper stating they will not cover meters, valves, or manholes, and they will have drainage around vault. 11. --/Need cleanout cover on sanitary sewer west side. Call Danny Hightower at 972-462-5150 to check punch list. CII'Y OF COPPELI, PUBLIC WORKS DEP.4RTMENT Dec 20 02 11:35e p.1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS From: Date: RE: Rick O'Dell, Construction Inspector Engineering Marshall Crow, Utilities Division December 17, 2002 Follow-up Walk-thru Wynnpage Phase II 1. ~//Paperwork on DC in vault, domestic, 2" DC & irrigation & letter from landscaper /need to come directly to Rick O'Dell. 2. I~/ Landscapers need to take care of drainage around top of vault. Call Danny Hightower at 972-462-5150 to check punch list. CITY OF COPPELL PUBLIC WORKS DEP.4RTMENT MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: FFom: Date: RE: Rick O'Dell, Construction Inspector Engineering Larry Morton, Streets Division Public Works 12/17/02 Walk-thru Wynnpage Phase II Paving 1. f Stain ADA ramp. 2. ~/Clear concrete spill in gutter. Drainage 1. O.K. CITY OF COPPEL£ PUBLIC WORKS DEPARTMENT I'd eSI:BO ~0 BI oaQ