Wynnpage Plaza-LR021108REPORT OF REINFORCING STEEL OBSERVATION
1E rracan
Consulting Engineers & Scientists
8901 Carpenter Fr~y., Suite #100
Date of Service:
Client No.:
Client:
11/08/02
1055
Pacific Builders, Inc.
3360 Wiley Post Rd., Ste. 100
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94021373.0009
94021373
Wynnpage
255Denton Tap
Coppell, TX
Services:
Drawings Utilized:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
S 1 and S3, dated March, 2002
Locations/Items Observed: Building Slab
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Placement X Stirrup Spacing & Type
Bar Grade X Propedy Tied X
RePar Olean X Dowel Bars in Place X Wetded Splices
Form Clean X Proper Supports X Mechanical Splices
Number of Bars X Proper Cover X Lapped Splices X
Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise
noted.
Field Results Report To: Bryan, Superintendent
lechnician: A. Tinoco
Report Distribution:
(1) Pacific Builders, ~nc.
(1) City of Coppell Engineering
309sks
lr'erracan
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced ~thout wdtten approval of HBC/Terracon.
REPORT OF CONCRETE PLACEMENT OBSERVATION
Report Number: 94021373.0007
Service Date: November 5, 2002
'lrerra on
8901 Carpenter F~, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Pacific Builders Inc
Attn: Charles Coleman
3360 Wiley Post Rd Ste 100
Carrollton TX 75006
Report Date: November 08, 2002
Project: Wynnpage
255 Denton Tap
Coppell, TX
Project Number: 94021373
Services: Concrete placement observation.
On this date, a HBC-Terracon technician arrived at the above referenced jobsite as scheduled for
concrete placement observation. After arriving at the jobsite, HBC's technician was notified that
the scheduled concrete placement was cancelled due to rain.
Technician: Christopher W. Eubanks
Report Distribution:
(1) Pacific Builders Inc
(1) City of Coppell Engineering
Reviewed by:
HBC/Terracon
Hussein H. Abusaad, P.E.
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 .~sKs~9~