Loading...
Wynnpage Plaza-LR021108REPORT OF REINFORCING STEEL OBSERVATION 1E rracan Consulting Engineers & Scientists 8901 Carpenter Fr~y., Suite #100 Date of Service: Client No.: Client: 11/08/02 1055 Pacific Builders, Inc. 3360 Wiley Post Rd., Ste. 100 Carrollton, TX 75006 Report No.: Project No.: Project: 94021373.0009 94021373 Wynnpage 255Denton Tap Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA S 1 and S3, dated March, 2002 Locations/Items Observed: Building Slab Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type Bar Size X Proper Placement X Stirrup Spacing & Type Bar Grade X Propedy Tied X RePar Olean X Dowel Bars in Place X Wetded Splices Form Clean X Proper Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices X Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Bryan, Superintendent lechnician: A. Tinoco Report Distribution: (1) Pacific Builders, ~nc. (1) City of Coppell Engineering 309sks lr'erracan Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced ~thout wdtten approval of HBC/Terracon. REPORT OF CONCRETE PLACEMENT OBSERVATION Report Number: 94021373.0007 Service Date: November 5, 2002 'lrerra on 8901 Carpenter F~, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Pacific Builders Inc Attn: Charles Coleman 3360 Wiley Post Rd Ste 100 Carrollton TX 75006 Report Date: November 08, 2002 Project: Wynnpage 255 Denton Tap Coppell, TX Project Number: 94021373 Services: Concrete placement observation. On this date, a HBC-Terracon technician arrived at the above referenced jobsite as scheduled for concrete placement observation. After arriving at the jobsite, HBC's technician was notified that the scheduled concrete placement was cancelled due to rain. Technician: Christopher W. Eubanks Report Distribution: (1) Pacific Builders Inc (1) City of Coppell Engineering Reviewed by: HBC/Terracon Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 .~sKs~9~