SW0001-AG021210* " K • e I * • • C P DEPT: EngineeringlPublic Works -AGENDA REQUEST FORM COPPELL * DATE: December 10, 2002 e a o ITEM #: 18 ITEM CAPTION: Consider approval of awarding Bid/Contract #Q- 0902 -01 to Green Scaping in the amount of $135,737 for the construction of the Riverchase Elevated Sidewalk as provided for in CRDC funds and by Carrollton- Farmers Branch ISD; and authorizing the City Manager to sign. APPROVED BY CITY COUNCIL ON ABOVE DATE, Y GOAL(S): EXECUTIVE SUMMARY: on to Approve - Tunnell - York Vote - 7 -0 Approval of this item will allow for the construction of a walkway to connect the Riverchase Subdivision across the TXU (Oncor) easement to the Riverchase Elementary School. Staff recommends awarding the bid for the construction of the Riverchase Elevated Sidewalk to Green Scaping in the amount of $135,737. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds for this contract will come from the /2 cent sales tax allocated to the CRDC. Agenda Request Form - Revised 09/02 Document Name: #eng3 -IAR �xy FIN. REVIEW: CM REVIEW: "� WK -Cxy '" DIR. REVIEW: K /'A Agenda Request Form - Revised 09/02 Document Name: #eng3 -IAR MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works Date: December 10, 2002 RE: Consider approval of awarding Bid/Contract #Q- 0902 -01 to Green Scaping in the amount of $135,737 for the construction of the Riverchase Elevated Sidewalk as provided for in CRDC funds and by Carrollton- Farmers Branch ISD; and authorizing the City Manager to sign. On October 8, 2002 the City of Coppell received and opened six bids for the construction of the Riverchase elevated sidewalk. The bids ranged from $135,737 to $179,881. My estimate for the construction was $160,000. The low bidder was Green Scaping in the amount of $135,737. The journey to construct this elevated sidewalk began in March 2000. City Council was initially briefed on this project on April 22, 2000. Since that time we have had: • A Wetlands Delineation Study performed; • meetings with representatives of the Carrollton- Farmers Branch Independent School District; • a public meeting with neighborhoods; an initial design; • TXU's (Oncor) disapproval of the initial design; • a redesign; • TXU's (Oncor) verbal approval of the redesign; • TXU's (Oncor) official denial of the redesign; • numerous meetings and telephone calls with representatives of TXU (Oncor); • TXU's (Oncor) approval of the revised design, with easement language that was disadvantageous to the City of Coppell; • an agreement reached between our attorney and their attorney on wording in the easement document; and TXU (Oncor) has now officially granted the City of Coppell permission to construct the elevated sidewalk through their easement. Our consultant has evaluated the low bidder and has recommended the award of the bid to the low bidder. Green Scaping has recently bid on several city projects, but this is the first project of which they were the low bidder. With the exception of the elevated portion of the walkway, they do have extensive experience in the other facets of the project. I have contacted the subcontractor that they will be utilizing for the construction of the elevated portion of the sidewalk and he has performed similar work in the past. The estimated time for the construction of the walkway is 90 calendar days. Therefore it should be completed in March 2003. This is approximately three years to the day since this project began. Staff recommends the award of Bid #Q- 0902 -01 to Green Scaping in the amount $135,737 and will be available to answer questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" RIVERCHASE ELEVATED SIDEWALK PROJECT # SW 00 -01 BASE BID Item Quantity Unit Description Green Seapin8 Simmons Construction Builders Linder Contraction Smith Coutracton Rehm Jim Brmvman Unit Price Toni Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 -1 1 1 -2 1 -3 677 1 147 12 CY LF EA Earth &Bartow Silt 1en" Hay Bak Chock Dam 30.00 2.00 25.00 20,310. 294. 300. 22.00 3.00 15.00 14,8% 441. 180. 1 20.00 3.00 17.00 13,540. 441. 204. 6. 2.00 300.00 4,062. 29 3,600. 15.00 3.50 55.00 10,155. 514.5 660. 47.00 2.00 10.00 31,819. 294. 120. 14 36 LF Concrete Saweut 10.00 360. 10.00 360. 12.00 432. 3.00 108. 15.00 540. 4.00 144. 1 -5 1-6 1 -7 283 2 497 SY EA LF 4" Concrete Sidewalk Bartiec Flee Ramp 8' Elevated Sidcwalk/Foundation Calendar Days 36.00 1200.00 205.00 10,188. 2,400. 101,885. 50.00 777.00 257.00 14,150. 1,554. 127,729. 1 47.00 740.(10 282.00 13 }Oi. 1,480. 140,154. 100 27.00 1,000.00 320.00 7,641. 2,000. 159,040. 35.00 1700.00 306.00 9,905. 3,400. 152,082. 27.00 600.00 279.00 7,641. 1,200. 138,663. 12 TOTALS S135,737.00 S 159x118. S 169.552.011 S 176,745. $ 177,256 4 S 179,881.