Loading...
SW0001-CS021217T H E C 1 T Y O F December 17, 2002 Curtis Green Green Scaping 8917 Cardinal Lane N. Richland Hills, TX 76180 COFFELL RE: Riverchase Elevated Sidewalk Project SW 00 -01 Dear Mr. Green: C At the December 10, 2002 City Council meeting, the referenced project was awarded to your firm. Enclosed with this letter are three original contract documents. Please execute the three originals; provide the required bonds and return two of the originals at the preconstruction conference. One of the copies is for your file. The preconstruction conference on the referenced project has been scheduled for Monday, January 6, 2003 at 3:00 p.m. in the second floor conference room at Town Center, 255 Parkway Blvd., Coppell, Texas. If you have any questions feel free to call Suzan Taylor, CIP Coordinator at 972/304 -7019 or Garreth Campbell, the inspector on this project, at 972/304 -3685. Sincerely, x., rP.�- Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304 -3686 Fax 972/304 -7041 cc: Suzan Taylor, CIP Coordinator Garreth Campbell, Inspector Larry Davis, Inspector Rick O'Dell, Inspector Bryan Williams, Oncor Fax 817/215 -6961 Charles Stringer, Dallas Water Utilities Fax 214/948 -4551 Todd Reck, Irving Water Utilities Fax 972/721 -2280 Bradley Moss, Pacheco Koch Fax 972/235 -9544 255 PARKWAY * P.0.80X 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673