December 17, 2002
Curtis Green
Green Scaping
8917 Cardinal Lane
N. Richland Hills, TX 76180
COFFELL
RE: Riverchase Elevated Sidewalk Project SW 00 -01
Dear Mr. Green:
C
At the December 10, 2002 City Council meeting, the referenced project was awarded to your firm.
Enclosed with this letter are three original contract documents. Please execute the three originals;
provide the required bonds and return two of the originals at the preconstruction conference. One
of the copies is for your file.
The preconstruction conference on the referenced project has been scheduled for Monday, January
6, 2003 at 3:00 p.m. in the second floor conference room at Town Center, 255 Parkway Blvd.,
Coppell, Texas.
If you have any questions feel free to call Suzan Taylor, CIP Coordinator at 972/304 -7019 or
Garreth Campbell, the inspector on this project, at 972/304 -3685.
Sincerely,
x., rP.�-
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304 -3686
Fax 972/304 -7041
cc: Suzan Taylor, CIP Coordinator
Garreth Campbell, Inspector
Larry Davis, Inspector
Rick O'Dell, Inspector
Bryan Williams, Oncor Fax 817/215 -6961
Charles Stringer, Dallas Water Utilities Fax 214/948 -4551
Todd Reck, Irving Water Utilities Fax 972/721 -2280
Bradley Moss, Pacheco Koch Fax 972/235 -9544