SW0001-MP030109RIVERCHASE SIDEWALK
SW 00-01
PACHECO KOCH ENGINEERING
ID
1
Task Name
DESIGN PHASE
Design
Advertisement
Bid Opening
City Council
PERMITS
TAS
RIGHT -OF -WAY
City of Irving
Response Received
Approved
Dallas Water Utilities
Approved
TXU Electric
Response Received
Response Received
Acquired by City
Lot 11 River Ridge Addition
Acquired by City
HOA River Ridge Addition
Acquired by City
CONSTRUCTION
Preconstruction Meetin g
Notice to Proceed
Construction
Jun
Qtr 3, 2001
Jul Aug I Sep
Qtr 4,_ 2001
Oct I Nov I Dec
Qtr 1, 2002
Jan I Feb Mar
Qtr 2, 2002
Apr I May j Jun
Qtr 3, 2002
Jul Aug rSep
Qtr 4, 20D
Qtr 1, 2003
_
Oct No�Dec
Jan Feb Mar
A 1018
. 12110
.8110
.,6122
. 616
., 7123
I
616
9130
vim
—
— —
pow W:
116
2
3
4
5
el
7
8
9
. 10110
10
11
12
13
14
.1018
I
1s
16
17
18
19
20
21
22
23
24
25
Project: SW 00-01 I Task Milestone . Summary ^ Deadline J L.
Date: Thu 119)03
Page 1
RIVERCHASE SIDEWALK
SW 00-01
PACHECO KOCH ENGINEERING
2 Design
On October 9, 2001 TXU decided not to approve the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission lines. Working with TXU to resolve issue.
7 TAS
Plans were submitted by Pacheco Koch. Minor comments were incorporated into the final bid set.
9 City of Irving
First request sent on September 12, 2001. Second letter sent with revised plans on May 7, 2002,
10 Response Received
City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement.
12 Dallas Water Utilities
First letter sent on September 12, 2001. Second letter send with revised plans on May 7, 2002.
14 TXU Electric
TXU denied request for use of easement. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20, 2002 which provided acceptable
areas for the crossing of the TXU easements. City sent letter March 22 with exhibit showing two options for the sidewalk layout.
15 Response Received
Did not approve the permit.
18 Response Received
Did not approve the permit.
17 Acquired by City
September 9, 2002 - TXU requested revised plat, wrong page number. PKCE revised.
23 Preconstruction Meeting
Contractor requested that the Notice to Proceed be delayed. The work limits are not easily accessible because of all the recent rain.
Page 2