SW0001-MP030109RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING ID 1 Task Name DESIGN PHASE Design Advertisement Bid Opening City Council PERMITS TAS RIGHT -OF -WAY City of Irving Response Received Approved Dallas Water Utilities Approved TXU Electric Response Received Response Received Acquired by City Lot 11 River Ridge Addition Acquired by City HOA River Ridge Addition Acquired by City CONSTRUCTION Preconstruction Meetin g Notice to Proceed Construction Jun Qtr 3, 2001 Jul Aug I Sep Qtr 4,_ 2001 Oct I Nov I Dec Qtr 1, 2002 Jan I Feb Mar Qtr 2, 2002 Apr I May j Jun Qtr 3, 2002 Jul Aug rSep Qtr 4, 20D Qtr 1, 2003 _ Oct No�Dec Jan Feb Mar A 1018 . 12110 .8110 .,6122 . 616 ., 7123 I 616 9130 vim — — — pow W: 116 2 3 4 5 el 7 8 9 . 10110 10 11 12 13 14 .1018 I 1s 16 17 18 19 20 21 22 23 24 25 Project: SW 00-01 I Task Milestone . Summary ^ Deadline J L. Date: Thu 119)03 Page 1 RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING 2 Design On October 9, 2001 TXU decided not to approve the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission lines. Working with TXU to resolve issue. 7 TAS Plans were submitted by Pacheco Koch. Minor comments were incorporated into the final bid set. 9 City of Irving First request sent on September 12, 2001. Second letter sent with revised plans on May 7, 2002, 10 Response Received City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement. 12 Dallas Water Utilities First letter sent on September 12, 2001. Second letter send with revised plans on May 7, 2002. 14 TXU Electric TXU denied request for use of easement. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20, 2002 which provided acceptable areas for the crossing of the TXU easements. City sent letter March 22 with exhibit showing two options for the sidewalk layout. 15 Response Received Did not approve the permit. 18 Response Received Did not approve the permit. 17 Acquired by City September 9, 2002 - TXU requested revised plat, wrong page number. PKCE revised. 23 Preconstruction Meeting Contractor requested that the Notice to Proceed be delayed. The work limits are not easily accessible because of all the recent rain. Page 2