Freeport NIP(2.7)-CS030102DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM. Product Support Services Freeport North Lot 2 Block 3 Site Plan, to allow the
development of a 70,000 square foot office /warehouse building on approximately
5.66 acres of property located at the southwest corner of Royal Lane and
Gateview Blvd., at the request of Ty Holcomb, Azimuth Architecture.
STAFF REP.: Marcie Diamond PROJECT ID# SPA -02 -0027
MC DATE: December 26, 2002 and January 2, 2003
I ONTACT: Teresa M. Turner, E.I. T., Graduate Engineer (972)304 -3681
OMMENT STATUS: PRELIMINARY ✓FINAL €D
AFTER n &Z
1. Indicate the primary truck access to the property. The proposed drain grate in the driveway
to Royal Lane will be allowed if it is able to withstand the anticipated truck traffic.
2. There may be some visibility issues at the west driveway onto Gateview. Verify sight
triangles with the landscaping plans.
3. The eastern driveway onto Gateview must either align with the existing driveway on the north
side of Gateview or be offset a minimum of 125 feet.
4. Additional FEMA requirements will not be necessary; however, the drainage easement
nearest Royal Lane should be realigned to reflect the actual floodplain elevations.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Product Support Services, Freeport North, Block 3 Lot 2, Replat, to allow the
development of a 70,000 square foot office /warehouse building on approximately
5.66 acres of property located at the southwest corner of Royal Lane and
Gateview Blvd., at the request of Ty Holcomb, Azimuth Architecture.
STAFF REP.: Marcie Diamond PROJECT ID# RP -02 -0028
DRC DATE: December 26, 2002 and January 2, 2003
CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681
COMMENT STATUS: PRELIARAA4R ✓FINAL REWSED
Include the following statements on the plat:
1. "Sidewalks will be constructed by the property owner when deemed necessary by the City
Engineer."
2. "The City of Coppell will have no responsibility for maintenance of the floodway /floodplain
areas as shown hereon; however, the City does have the authority to regulate activity in the
floodway /floodplain as per the City's Floodplain Ordinance. The maintenance of these areas
shall be the sole responsibility of the individual owner(s) adjacent to said areas. These areas
are to remain free of improvements that may obstruct the flow of stormwater and protected
from potential erosion by the owner(s). No fences will be allowed in the floodplain, along
with other structures as per the City's Floodplain Ordinance."