Loading...
ST9304-CS030113(;Rhonda Brothers- fie: Belt -Line Rd intersections Page 1 5-f 13 -vLf From: Per Birdsall To: Rhonda Brothers Date: 1/13/03 12:00PM Subject: Re: Belt Line Rd intersections The materials have been ordered. The new signs should be up in about three weeks. In the interim, I'll have normal size street blades (which were all that was there before) installed. >>> Rhonda Brothers 01/13/03 11:15AM >>> A caller asked if street signs removed during construction were going to be replaced at Mockingbird Ln and at Moore Rd intersections with Belt Line to identify those streets? Do you know if this is Dallas County's responsibility or ours? If it is them, do we need to remind someone? Rhonda Brothers Engineering Dept. Secretary CC: Brent Adams; Cody Wildoner; Larry Morton