Loading...
ST9902-CS030109 l~uz~n Taylor ~ RE:G~or91~n"qr ~E~t~~s~- ~~~rL~rejb"e pUbl!Cme~trn9~i~'bih~I~?, ~'..~ '...m"..........~..........."...".,,-...<',~.c--,.,",="".~,--.","~.c,...'.,.,1 ~",~,~~e :u ,S-, Ch'{-02 5a~y.A.L.\ L_cUL.2- From: To: Date: Subject: Suzan Taylor jaguirre@obsworld.com 1/9/039:47AM RE: Georgian Dr Estates - When are the public meetings to be held? Jorge: The meeting(s) for Sandy Lake have not been scheduled yet. Residents will be notified by means of mail-outs and publication in the newpaper. >>> jagred1@attbi.com 01/09/03 09:48AM >>> Susan , Regarding the public meeting to discuss the paving and planting designs, When are the public meetings to be held? -----Original Message---- From: Suzan Taylor Imailto:stavlor@cLcoooell.tx.usl Sent: Wednesday, January 08, 20034:37 PM To: iaauirre@obsworld.com Subject: RE: Georgian Dr Estates - Proposal for Linear Sidewalk Jorge: The plans are for a 4-lane divided roadway. There was an alternate study done to determine if additional trees would be saved if a 4-lane undivided roadway was constructed from Cottonwood Drvie eastward to Denton Tap. The alternate did not save any additional trees. The Parks and Recreation Department is responsible for the planting design that will be installed along Sandy Lake once the paving improvements are completed. You will have the opportunity to have input on both the paving and planting designs in the public meetings. Suzan >>> iaared1@attbLcom 01/08/03 03:30PM >>> Susan, Thanks for forwarding my Email on to Ken. I was very saddened to hear that these trees will be removed. They make Sandy Lake Road and this community Beautiful. Is their anyway that we can save the Tree Line as it stands now? What is the probability that the Tree Line will be removed and what is the preliminary discussion on replacing them? Is there anyway that we can plan to compensate for the removal of those trees by being proactive and planting a New Line of trees now, allowing time for growth to take place and have some trees ready for when the time comes? Removing these trees is seriously going to affect us. Did you know that Ir~~z<iliI~xl9ic:~~~:G~2~91~!!Q!Istafe~_- whei! ~~e.t~~p~"~lrc~meetLrl:9~tob~J,~r~t1,=_ ' , :"' .. ... , ?a'ge2] every morning there are Finches and other beautiful wildlife that come here because of those trees. Having that area bare will make all current wildlife leave this area. Attracting them back 10 years or more down the road is not easy. Therefore if we plant something now we will not lose the current environment. Has anyone brought up this topic? What can we do to help? We should not wait to consider alternatives. If we do we will have a bare Sandy Lake Road along with all the negatives that come from it. Therefore, we would like to participate in voicing our concerns and desires in the preliminary plans. After all, we live here and would like to get some input in the planning process instead of being the recipient of what another has planned for us. Which mayor may not be in our best interest. The Tunnel of Trees as shown in the Proposal I sent you reflects what we would like to have. Planting a New Line of Trees today will get us we want to be tomorrow. Currently we are not far from that plan. Once Sandy Lake Road gets widened there will be an increase in Traffic and Noise. Our Kids will be walking to the High School and we walk to the High School Games as well. We enjoy this area as it is now, and it is one of the most beautiful parts of Coppell. Is their anything you can do for us that at maintains the same amount of Trees and prevents the destruction of the Beauty and the loss of wildlife that we currently enjoy? We are in Partnership with you to keep Coppell Beautiful. ----Original Message----- From: Suzan Taylor Imailto:stavlorliilci.coooell.tx.usl Sent: Wednesday, January 08,20032:08 PM To: iaauirre@obsworld.com Subject: Re: Georgian Dr Estates - Proposal for Linear Sidewalk Jorge: I received the slide presentation and forwarded a copy to the City Engineer, Ken Griffin. I hope that you are aware that all of the existing trees shown in your presentation are within the project limits and will be removed. We are still in the preliminary design phase of the project and are scheduled to meet with the design engineer next week to discuss our preliminary comments. We will be scheduling public I sui~ !_~Jcl'r :}{(-~~()rgI~~J)! -~~le~~- :W1l~~~~]6~E!JJ?:11P: 1Ji~~t[rl9~ I~~~~~i~? - - : "" :" - _ --- H I Pa e 3 "" - '~~m_""....,.,__,IJlE:_~, meetings after that time to get input from the public. You are welcome to present your concerns and ideas at those meetings. Suzan Taylor CI P Coordinator >>> iaared1talattbLcom 01/08/03 01:34PM >>> Dear Susan, Attached you will find the Power Point Presentation regarding the Sandy Lake Sidewalk Improvements. As you know we would like to have a straight Linear Sidewalk to accomplish the Tunnel of Trees walkways and provide privacy to our homes that backup onto Sandy Lake Road. We would not like the currently proposed Meandering Walk ways and this is the purpose of this presentation. Please reply with any questions, comments or suggestions. We are in Partnership with you. Best wishes, Jorge Aguirre Optimal Business Solutions Office: 972-745-9089 Mobile: 214-663-2920 Email: iaauirretalobsworld.com Web Page: www.obsworld.com Privacy and Confidentiality Notice The information contained in this transmission is intended for the above-named recipient(s) only and contains privileged and confidential information. If the reader of this message is not an intended recipient, you are strictly prohibited from using, copying, distributing, or taking any action in reliance on such information. If you have received this communication in error, please notify us immediately.