Loading...
ST9904-CS020809 TxDOT SH 121 TASK FORCE REPORT ~/~ Note: Section numbers in narrative below correspond to numbers on drawings. I. COMPLETED PROJECTS Section From To Description Date Completed 1 Tarrant CL Denton CR 4-lane ML w/2-lane FR Jul 1992 2 Denton CR 1H 35E 4/6 lane divided highway Nov 1993 3 1H 35E FM 1171 6-lane divided highway Jun 1991 4 FM 1171 Elm Fork 6-lane divided highway Jul 1988 5 Elm Fork BNRR 4-1ane divided highway Feb 1994 5B Crider Road FM 423 Eliminate intersection Sep 1995 6 BNRR Legacy 4-lane divided highway Mar 1994 7 Legacy SH 289 4-lane divided highway May 1995 9 Denton CR Denton Tap Road BP: 3-lane frontage roads Oct 1998 10 Denton Tap Road Lake Vista BP: 3-lane frontage roads Jul 1988 11 Lake Vista IH 35E BP: 3-lane frontage roads Jun 1996 12 IH 35E FM 544 BP: 3-lane frontage roads Oct 1999 II. DENTON COUNTY PROJECTS A. Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway)(CSJ 0364-02-017 & 0364-03-064) 1. The Texas Transportation Commission at their July 2001 meeting under the Innovative Financing Program advanced this project to Priority 1 in Category 3A - NHS Mobility. 2. Estimated Construction Costs: CSJ COUNTY FROM TO Length COST Letting FY Based on Projected Funding Levels 0364-02-017 Dallas Tarrant CL Denton CL 1.728 0364-03-064 Denton Dallas CL Denton Crk 0.300 Total TxDOT's Fort Worth District is including this section of the SH 121 Free- way in an ongoing MIS, Schematic, and EA consultant contract they have in the area. The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following Page 1 of 3 Updated: 08/09/02 8:22 AM are estimated milestone dates: DESCRIPTION ESTIMATED DATE MIS Complete Public Meeting: Preliminary Schematic and EA findings presented. ~ ~02 Public Heating: Final Schematic and Final EA presented. The Public Meeting and Hearing dates have been pushed back to allow the consultant to address ~affie m0deligg issuea and Grapevine and Coppell ramp location concerns. The Dallas District will handle the PS&E (either in-house or in partnership with Denton County). Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville Bypass)(Mainlanes)(CSJ 3547-03-003, 3547-02-004, 3547- 01-005, 3547-01-008, & 3547-01-009) Denton County 1. Estimated Construction Costs: CSJ Designer FROM TO Length COST Letting FY Based on Projected Funding Levels 3547-03-003 Halff SH 121 Dallas CL 0.500 3547-02-004 Halff Denton CL Denton CL 1.800 $i 2003 3547-01-005 Halff Dallas CL Lake Vista 1.085 3547-01-008 Halff Lake Vista IH 35E 0.730 Sub 3547-01-009 C&B Hebron FM 544 3.432 $37,120,000 2004 Total $i! The I~lff projects listed above will be corabin~ into one ¢¢natmction contract, o processing for a january 2003letting. Section 15: Denton County Portion: FM 544 to DNT Bridgefarmer Design The Texas Transportation Commission at their July 2001 meeting under the Innovative Financing Program advanced these frontage road projects to Priority 1 in Category 3A - NHS Mobility. These mainlanes will be fimded with a combination of local funds and funding from the North Central Texas Council of Governments (NCTCOG). Page 2 of 3 Updated: 08/09/02 8:22 AM 3. Construction Costs: CSJ County FROM TO Length COST Letting FY Based on Projected Funding Levels 0364-03-066 Denton FM 544 Collin CL 4.947 ~i~800~ 2004 0364-04-038 Collin Denton CL DNT 0.982 $!~4~ 2004 Total Sa9 Q~ III. COLLIN COUNTY PROJECTS A. Section 15: Collin County Portion: DNT to US 75 1. Project Under Construction: CSJ County FROM TO Length COST LETTING DATE 0364-04-023 # Collin DNT Interchange $31,000,000 11-27-2001 [ I Total $31,000,000 # NTTA pr0j~ct with joint funding: NTTA = $19.9M; TxDOT = $11.1M. Note: The Minute Order allowing the NTTA to construct the DNT Interchange was executed by the Texas Transportation Commission at its March 2001 meeting. 2. Current Design Projects: CSJ County FROM TO Length COST LETTING DATE 0364-04-037 Collin DNT Custer 4.912 $45,800,000 04-2003 0364-04-022 Collin Custer US 75 6.037 $~6;80~ 0~ ~ i-~002 Total ~'t 0~6Q~,~~ Note: Project 0364-04-037 includes mainlanes from the DNT to SH 289 and the 3-level inter- change at SH 289. Project 0364-04-022 includes the overpass and ramps at Custer Road. 4. Future Project: CSJ County FROM TO Length COST 0364-04-024 (ML) Collin SH289 US 75 9.059 $90,000,000 Total $90,000,000 Page 3 of 3 Updated: 08/09/02 8:22 AM