Loading...
Prestwick-CS030116MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Greg Jones, Chief Building Official d~ . From: Larry Davis, Construction Inspector Date: January 16, 2003 RE: Prestwick Erosion Control As a follow-up response to your memo of January 14 regarding Prestwick erosion control, please be aware that Brentwood Builders has not completed the clean up work as they promised in our joint meeting last year. Mr. Estrada continues to experience silt washing from Prestwick that fills up his ditches and keeps his lot from draining to Deforest. Once again, as I stated in my last memo, it appears as though Brentwood is not in compliance with erosion control and drainage requirements. They were told to make contact with the City when the adjustments they agreed to last year were completed. If contact was made with another department, that information was not made available to us. They have not contacted the Engineering Department and it seems reasonable to assume that the work has not been done considering the continued complaints. In addition to Mr. Estrada's problem there have been two other similar complaints directed to me (one called in to Planning and another to Engineering) regarding this subdivision. The contractor/builder has been using private property at MacArthur and Deforest to gain access to lots in Prestwick, in the process causing drainage problems and damage to personal signage on the property. Another homeowner further east on Deforest reported drainage problems that may also be attributable to Prestwick erosion control failures. Please contact me if you feel that further action can be taken to solve this problem. cc: Ken Griffin, Director of Engineering/Public Works Robert Kruse, Fire Chief Gary Sieb, Director of Planning & Economic Development "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"