Freeport NIP(7.0)-CS030121Jack Evans
Pacheco Koch Consulting Engineers
8350 N. Central Expwy., Suite 1000
Dallas, TX 75206
RE: Duke Freeport X (The Container Store)
Fee Assessment Letter
Dear Mr. Evans:
Sincerely,
r KUr
Teresa M. Turner, E.I.T.
Graduate Engineer
T H E C 1 T Y •O F
COPPELL
January 21, 2003
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $0.00 and forward to the
Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the
assessed fees that need to be paid prior to Council approval. Please note that the Texas Legislature, under
Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building
Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% 4%
construction inspection fee can be verified. The construction inspection fees must be paid prior to the
scheduled pre construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
cc: Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Interim Director of Parks and Recreation
255 PARKWAY P.O.BOX 479 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673
Project: Duke-Freeport X
Date: 1/21/03
DEVELOPMENT FEE TABLE
TOTAL
FEES DUE
AMOUNT DUE
PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee
(100% due at Issuance of Building Permit)
$7,420.00
Water Tap Inspection Fee
(100% due at Issuance of Water Meter)
$250.00
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
$205.28
Water Meter Fee (Irrigation/Fireline)
(100% due at Issuance of Water Meter)
$6,431.90
Water Meter Deposit (Domestic)
(100% due at Issuance of Water Meter)
$30.00
Irrigation/Fireline Meter Deposit
(100% due at Issuance of Water Meter)
$120.00
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
$2,240.00
Wastewater Tap Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Park Fee
(100% due prior to Council Approval)
$0.00
$0.00
Roadway Impact Fee
'(100% due prior to Council Approval)
$0.00
$0.00
Street Light Fee
(100% due prior to Acceptance of Project)
Information not Available
11
Information not Available
11
Information not Available
Street Sign Fee
(100% due prior to Acceptance of Project)
Construction Inspection Fee
(100% due prior to Start of Construction)
TOTAL
$16,797.18
$0.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
Project: Duke-Freeport X
Date: 1/21/03
DEVELOPMENT FEE TABLE
PROJECT: Duke-Freeport X
DATE: 1/21/03
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
Water Tap Inspection Fee:
Total
DEVELOPMENT FEE WORKSHEET
Total 26.5 ESU's $280.00 ea. $7,420.00
(Due prior to issuance of building permit)
1 2 inch 8 ESU's
2 2 inch 16 ESU's
0 0 ESU's
2 10 inch 2.5 ESU's
5 Connections $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 1 Domestic Meter(s) $205.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 2 Irrigation Meter(s) $205.28 $410.56
Total 0 Additional Irrigation Meter(s) $0.00 $0.00
Total 2 Fireline Meter(s) $3,010.67 $6,021.34
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total 1 Meter(s) $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 4 Meter(s) $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8 $280.00 ea. $2,240.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total 1 Connections $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 1 Lots $50.00 ea. $50.00
Park Fee (For Residential Developments Only):
Preliminary plat approved:
(100% due prior to issuance of building permit)
0 Single- family $0.00 per lot
0 Multi family $0.00 per unit
(50% paid prior to Council approval of final plat)
Page 1
$250.00
$205.28
$30.00
$120.00
$50.00
$0.00
$0.00
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Information not Available
Information not Available
Information not Available
Service Area
4
Category
Industrial
Land Use
General Light Industrial
Building Area (sf)
1,026,500
Development Units
1,026.50
Vehicle Miles per Development Unit
1.06
Fee per Vehicle Mile
$300
Roadway Impact Fee due (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile)
$326,427.00
PROJECT: Duke Freeport X
DATE: 1/21/03
ROADWAY IMPACT FEE:
ROADWAY IMPACT FEE CALCULATIONS
(Figure 2 Roadway Impact Fee Study)
(Table 3 Roadway Impact Fee Study)
(Schedule 2, Page 3 Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees
Total Credit
MOUId Di1E
100%
$326,427.00