Loading...
Mercantile-CS021226DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: The Mercantile Addition, Lots 1 and 2 Block A. Minor Plat, to allow the development of two office buildings totaling approximately 21,940 square feet on 2.658 acres of property located along the east side of Denton Tap Road, north of Belt Line Road at the request of Greg Yancey, Turner- Gesek Investments. STAFF REP.: Andrea Roy PROJECT ID#MP-02-0026 DRC DATE: December 26, 2002 and January 2, 2003 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: /PRELIMINARY ~4E €B e rrrrn r~s~~ 1. Depending on the alignment of the sidewalk along Denton Tap, additional sidewalk easements may be necessary. 2. Are you proposing a mutual access easement to the property to the north? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: The Mercantile Addition Lots 1 and 2, Block A, Site Plan, to allow the development of two office buildings totaling approximately 21,940 square feet on 2.658 acres of property located along the east side of Denton Tap Road, north of Belt Line Road, at the request of Greg Yancey, Turaer- Gesek Investments. STAFF REP.: Andrea Rov PROJECT ID# SPA-02-0025 DRC DATE: December 26, 2002 and January 2, 2003 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: /PRELIMINARY ~A~4b R€~FS€B ~i: More clearly indicate what is proposed in Phase One and Phase Two. 2. Show the right-of--way limits and include a vicinity maQon the Site Plan. ~3~Are you proposing to extend the 8" waterline from the north? ,r4~P ovide water services to the site from a single tap to the main. ~_.S!The 8" sanitary sewer line is actually a 15" line along the east side of Denton Tap Road. ~On the preliminary drainage plan, show more detail where the 18" and 24" RCP's become open drainage. It may be necessary to build all of the drainage system with Phase One if positive drainage cannot be achieved. ~7!f,abel the approach radii for the driveway to Denton Tap on the Site Plan.