Mercantile-CS021226DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: The Mercantile Addition, Lots 1 and 2 Block A. Minor Plat, to allow the
development of two office buildings totaling approximately 21,940 square
feet on 2.658 acres of property located along the east side of Denton Tap
Road, north of Belt Line Road at the request of Greg Yancey, Turner-
Gesek Investments.
STAFF REP.: Andrea Roy PROJECT ID#MP-02-0026
DRC DATE: December 26, 2002 and January 2, 2003
CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681
COMMENT STATUS: /PRELIMINARY ~4E €B
e rrrrn r~s~~
1. Depending on the alignment of the sidewalk along Denton Tap, additional sidewalk
easements may be necessary.
2. Are you proposing a mutual access easement to the property to the north?
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: The Mercantile Addition Lots 1 and 2, Block A, Site Plan, to allow the
development of two office buildings totaling approximately 21,940 square
feet on 2.658 acres of property located along the east side of Denton Tap
Road, north of Belt Line Road, at the request of Greg Yancey, Turaer-
Gesek Investments.
STAFF REP.: Andrea Rov PROJECT ID# SPA-02-0025
DRC DATE: December 26, 2002 and January 2, 2003
CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681
COMMENT STATUS: /PRELIMINARY ~A~4b R€~FS€B
~i: More clearly indicate what is proposed in Phase One and Phase Two.
2. Show the right-of--way limits and include a vicinity maQon the Site Plan.
~3~Are you proposing to extend the 8" waterline from the north?
,r4~P ovide water services to the site from a single tap to the main.
~_.S!The 8" sanitary sewer line is actually a 15" line along the east side of Denton Tap Road.
~On the preliminary drainage plan, show more detail where the 18" and 24" RCP's become
open drainage. It may be necessary to build all of the drainage system with Phase One if
positive drainage cannot be achieved.
~7!f,abel the approach radii for the driveway to Denton Tap on the Site Plan.